My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/1/1981
CBCC
>
Meetings
>
1980's
>
1981
>
4/1/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:16 AM
Creation date
6/11/2015 12:59:32 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/01/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE <br />OWNER <br />ARCHITECT <br />❑ <br />❑ <br />ORDER <br />CONTRACTOR <br />FIELD <br />❑ <br />❑ <br />AIA DOCUMENT G701 <br />OTHER <br />The new Contract Sum including this Change Order will be . . . . . . . . . <br />PROJECT: <br />(name, address) <br />TO (Contractor) <br />I <br />Indian River County CHANGE ORDER NUMBER: 22 <br />County Administration BLdg. <br />ARCHITECT'S PROJECT NO:9363 <br />Reinhold Construction Inc. CONTRACT FOR: Addit ions & Renovations <br />P.O•Box 666 <br />-Cocoa, FL 32922 <br />L _j CONTRACT DATE: Apr i 1 2, 1980 <br />You are directed to make the following changes in this Contract: <br />CP -48 Due to field conditions ( moisture damage). <br />Provide new laminate finish (double furred) at north wall of <br />Roam W103 and corredDr W111. $984.65 <br />The proposed changes in the work may result In Additional time <br />required beyond the contract completion daste. Additional time <br />will be added to the contract that is directly related to this change <br />order. The contractor will be paid for the additional required days <br />at the rate of $300.00 (three hundred) per day for fixed overhead <br />costs. The number of days requested are reflected in the attached <br />documents. <br />The original Contract Sum was . . . . . . . . . . . . . . . . . . . <br />. . $ 2 , 748, 000, 00 <br />Net change by previous Change Orders . . . . . . . . . . . . . . . . <br />. . $ 225,399-00 <br />The Contract Sum prior to this Change Order was . . . . . . . . . . . . . <br />. . $ 2,973,399-00 <br />The Contract Sum will be (increased) (tXt'c,1(d(a)(i+{%X(141(a4 XXM by this Change Order . <br />. . $ 984,65 <br />The new Contract Sum including this Change Order will be . . . . . . . . . <br />. . $ 2,974,383.65 <br />The Contract Time will be (increased) (decreased) (unchanged) by <br />( -- ) Days. <br />The Date of Completion as of the date of this Change Order therefore is <br />—CONNELL METrAtF E. Enny REINHOL>LGONSTRUCTION INC_ <br />ARCHITECT <br />INDIAN RIVER COURTY__ <br />CONTRACT( <br />.fi n Hid way P 0�_p <br />Address <br />?145R 14th Ave. <br />Address <br />Address <br />Co;.oa, FL 32922 <br />Vero Beach, FL 32960 <br />DATE DATE <br />,(� q <br />DATE "l — .— pIr <br />AIA DOCUMENT 0701 • CHANGE ORDER APRIL 1970 EDITION AIAS m 1970 THE <br />AMERICAN I\STITL;TE Of ARCHITECTS, 1735 NEW YORK AVE.. NW, WASHINGTON, D.C. 20006 <br />ONE PAGE <br />:r <br />1 i 39 �aG 46 FA 215' <br />
The URL can be used to link to this page
Your browser does not support the video tag.