My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/1/1981
CBCC
>
Meetings
>
1980's
>
1981
>
4/1/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:16 AM
Creation date
6/11/2015 12:59:32 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/01/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
View images
View plain text
APR 11991 <br />CHANGE OWNER EJ <br />ARCHIT[CT ❑ <br />• i9 <br />Y.t <br />Bao <br />ORDER CONTRACTOR ❑ <br />FIELD fl <br />AiA DOCUMENT G701 OTHER <br />PROJECT: Indian River County CHANGE ORDER NUMBER: 23 (twenty three) <br />(name,address) County Adnin,J:stration Bldg, <br />TO (Contractor) <br />Reinhold Construction Inc <br />P.�0. Box 666 <br />Cocoa, FL 32922 <br />ARCHITECT'S PROJECT NO: 9363 <br />CONTRACT FOR: Additions & Renovations <br />L I CONTRACT DATE: 4-2-80 <br />You are directed to make the following changes in this Contract: - <br />CP -55 Provide a new lid for the existing water meter per the attached $1,484,89 <br />change proposal at the owners request/ <br />CP=59 Repair curb damage per the attached change proposal at the 222,17 <br />owners request. -- <br />Total ------ $1,707.06 <br />The proposed changes in the work may result in Additional time <br />required beyond the contract completion date. Additional time <br />will be added to the contract that is directly related to this charge <br />order. The contractor will be paid for the additional required days <br />at the rate of $300.00 (three hundred) per day for fixed overhead <br />costs. The number of days requested are reflected in the attached <br />documents. <br />r� <br />The original Contract Sum was . . . . . . . . . . . . . . . . . . . . . $ 2 , 748 , 000.00 <br />Net change by previous Change Orders . less C0,17. (rejected) . . . . . . $ 221 ,101.73 <br />The Contract Sum prior to this Change Order was . . . . . . . . . . . . . . . $ 2,969,101-73 <br />The Contract Sum will be (increased) (dWi✓e *W*(*EigK0%)6y this Change Order. . . $ 1, 707.06 <br />The new Contract Sum including this Change Order will be . . . . . . . . . . . $ 2,970,803-79 <br />The Contract Time will be (increased) (decreased) (unchanged) by ( -- ) Days. <br />The Date of Completion as of the date of this Change Order therefore is <br />rnNNFI t <br />ARCHITECT <br />Address <br />Cnr;ql rahl -.Ek 33134 <br />DATE <br />BEINHUD CONSTRUCTION INC. <br />SOT%OxD�55 <br />Address <br />Coeoa. FL/ 32922-. <br />/BY <br />DATE <br />AIA DOCUMENT 6701 • CHANGE ORDER • APRIL 1970 EDITION • AIA8 • m 1970 • THE <br />AMERICAN IM1STITUIE OF ARCHITECTS, 1735 NEW YORK AVE.. NW, WASHINGTON, D.C. 20006 <br />INDIAN RIVER COUNTY <br />(MV 14th Ave. <br />Address <br />Vero Beach, FL 32960 <br />DATE <br />ONE PAGE <br />a <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).