My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/1/1981
CBCC
>
Meetings
>
1980's
>
1981
>
4/1/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:16 AM
Creation date
6/11/2015 12:59:32 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/01/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- --OWER <br />CHANGE <br />ARCHIUCT <br />❑ <br />p <br />R <br />oll®Ep <br />CONTRACTOR <br />�] <br />FIELD <br />❑ <br />AiA DOCUMENT G701 <br />OTHER <br />PROJECT: Indian River County CHANGE ORDER NUMBER: 25 (twenty five) <br />(name, address) Administration Building <br />TO (Contractor) <br />ARCHITECT'S PROJECT NO: 9363 <br />Reinhold Construction Inc. CONTRACT FOR:Additions >; Renovations <br />P,O.Box 666 <br />Cocoa, FL 32922 <br />L <br />I CONTRACT DATE: 4-2-80 <br />You are directed to make the following changes in this Contract: <br />CP -54 Regrade access road to provide drainage per the attached <br />change proposal due to field conditions. <br />$1,519.04 <br />The proposed changes in the w.)rk may result in additional time <br />required beyond the contract completion date. Additional time <br />will be added to the contract that is directly related to this change <br />order. The contractor will be paid for the additional required days <br />at the rate of $300.00 (three hundred) per day for fixed overhead <br />costs. <br />The original Contract Sum was . . . . . . . . . . • • • • • • • • • •$ 2 , 748, 008:00 <br />Net change by previous Change Orders . . . . . . . . . . . . . . . . .$ 222,808.79 <br />The Contract Sum prior to this Change Order was . . . . . . . . . . . . . . . $ 2 , 970, 808.79 , <br />The Contract Sum will be (increased) (decreased) (unchanged) by this Change Order . . . $ 1,519A <br />The new Contract Sum including this Change Order will be . . . . . . . . . $ 2,972,327.83 <br />The Contract Time will be (increased) (decreased) (unchanged) by ( ) Days. <br />The Date of Completion as of the date of this Change Order therefore is , <br />ARCHITECT <br />1 nlxip . •.,- <br />� 1r <br />BF H()t D coNSTRIIrna INC,._ <br />CONTRACTOR <br />p,0 Box 666 <br />Address <br />Cocoa FL 32922 <br />BY <br />DATE <br />AIA DOCUMENT 0701 • CHANGE ORDER • APRIL 1970 EDITION • AIAS • m 1970 • THE <br />AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE.. NW. WASHINGTON, D.C. 20006 <br />'FT 0:• <br />—LNDIAN SIVFR CoiINTY <br />OWNER <br />2145 14th Ave. <br />Address <br />ro Beach. FL 32960 <br />BY !•- <br />DATE 1 <br />ONE PAGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.