My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-280
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 3:11:30 PM
Creation date
10/5/2015 9:04:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/06/2009
Control Number
2009-280
Agenda Item Number
8.L.
Entity Name
Masci Corporation
Subject
Potable Water Main 77th. Street
Area
77th St.
Project Number
UCP 3086
Bid Number
2009064
Supplemental fields
SmeadsoftID
8783
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 8 OWNER'S RESPONSIBILITIES <br />SC -8.02 Delete paragraph 8.02 of the General Conditions in its entirety and replace with the <br />following <br />If Owner terminates the employmentof Engineer, Owner may appoint another engineer whose <br />status under the Contract Documents shall be that of the former Engineer. <br />SC -8.04 Delete paragraph, 8.04 of the General Conditions _in its entirety and replace with the following: __ _ <br />9� <br />Payments under this contract are governed by the Local Government Prompt Payment Act, Florida <br />Statutes section 218.70 et. seq., <br />SC -8.06 <br />Delete paragraph 8.06 of the General Conditions in its entirety. <br />SC -8.11 <br />Delete paragraph 8.11 of the General Conditions in its entirety. <br />ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION <br />SC 9.02 Delete the first sentence of paragraph 9.03A of the General Conditions in its entirety and <br />replace with the following: <br />A. Engineer will make visits to the Site at intervals appropriate to the various stages of construction <br />as Engineer deems necessary in order to observe as an experienced and qualified Engineer the <br />progress that has been made and the quality_of the various aspects of Contractor's executed Work. <br />SC -9.03A <br />Add the following new paragraph immediately after paragraph 9.03A of the General Conditions <br />which is to read as follows: <br />B. Engineer will furnish a part-time Resident Project Representative. Contractor is responsible to <br />give 24-hour notice on all required inspections so that the Resident Project Representative may be <br />present. <br />SC 9.04 A Delete the third sentence of paragraph 9.04A of the General Conditions in its entirety and <br />replace with the following: <br />However, if Contractor claims entitlement to additional time or money as a result of the Field Order, <br />such entitlement is conditioned upon obtaining a Change Order authorized and executed by Owner <br />after timely making a Claim as provided in the Contract Documents. <br />SC 9.08-A: <br />Delete the second sentence of 9.08A of the General Conditions in its entirety and replace with the <br />following: <br />00800-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.