Laserfiche WebLink
WORK CHANGE DIRECTIVE <br />No. <br />PROJECT: Brine Line Conversion To A Potable Water Main — 77th Street <br />DATE OF ISSUANCE: <br />OWNER: Indian River Count 1801 27th Street Vero Beach Florida 32960 <br />(Name, Address) <br />CONTRACTOR: OWNER's Project No.: <br />ENGINEER: Schulke Bittle & Stoddard LLC <br />CONTRACT FOR: ENGINEER's Project No.: 08-091 <br />You are directed to proceed with the following change(s): <br />Description: <br />Purpose of Work Directive Change: <br />Attachment(s) (list documents supporting change): <br />If a claim is made that the above change(s) have affected Contract Price.or Contract Time, any <br />claim for a Change Order based thereon will involve one of the following methods of determining the <br />effect of the change(s). <br />Method of determining change in Contract Price: Method of determining change in Contract <br />Time: <br />[ j Time and Materials [ ] Contractor's records <br />[ j Unit Prices [ j Engineer's records <br />(] Cost plus fixed fee [ j Other <br />Estimated increase (decrease) in Contract Price <br />$ . If the <br />change involves an increase, the estimated <br />exceed <br />amount is not to be exceeded without further <br />authorizatiori- . <br />Estimated increase (decrease) in Contract Time <br />days. If the change involves an <br />increase, the estimated time is not to be <br />without further authorization. <br />Once the Work covered by the directive is completed or final cost and time determined, Contractor <br />should submit documentation for inclusion in a change Order. <br />THIS IS A DIRECTIVE TO PROCEED WITH A CHANGE THAT MAY AFFECT THE CONTRACT <br />PRICE OR THE CONTRACT TIME. A CHANGE ORDER, IF ANY, SHOULD BE CONSIDERED <br />PROMPTLY. <br />By: By: <br />Engineer Owner <br />Date: Date: <br />00800-25 <br />