My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-280
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 3:11:30 PM
Creation date
10/5/2015 9:04:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/06/2009
Control Number
2009-280
Agenda Item Number
8.L.
Entity Name
Masci Corporation
Subject
Potable Water Main 77th. Street
Area
77th St.
Project Number
UCP 3086
Bid Number
2009064
Supplemental fields
SmeadsoftID
8783
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK CHANGE DIRECTIVE <br />No. <br />PROJECT: Brine Line Conversion To A Potable Water Main — 77th Street <br />DATE OF ISSUANCE: <br />OWNER: Indian River Count 1801 27th Street Vero Beach Florida 32960 <br />(Name, Address) <br />CONTRACTOR: OWNER's Project No.: <br />ENGINEER: Schulke Bittle & Stoddard LLC <br />CONTRACT FOR: ENGINEER's Project No.: 08-091 <br />You are directed to proceed with the following change(s): <br />Description: <br />Purpose of Work Directive Change: <br />Attachment(s) (list documents supporting change): <br />If a claim is made that the above change(s) have affected Contract Price.or Contract Time, any <br />claim for a Change Order based thereon will involve one of the following methods of determining the <br />effect of the change(s). <br />Method of determining change in Contract Price: Method of determining change in Contract <br />Time: <br />[ j Time and Materials [ ] Contractor's records <br />[ j Unit Prices [ j Engineer's records <br />(] Cost plus fixed fee [ j Other <br />Estimated increase (decrease) in Contract Price <br />$ . If the <br />change involves an increase, the estimated <br />exceed <br />amount is not to be exceeded without further <br />authorizatiori- . <br />Estimated increase (decrease) in Contract Time <br />days. If the change involves an <br />increase, the estimated time is not to be <br />without further authorization. <br />Once the Work covered by the directive is completed or final cost and time determined, Contractor <br />should submit documentation for inclusion in a change Order. <br />THIS IS A DIRECTIVE TO PROCEED WITH A CHANGE THAT MAY AFFECT THE CONTRACT <br />PRICE OR THE CONTRACT TIME. A CHANGE ORDER, IF ANY, SHOULD BE CONSIDERED <br />PROMPTLY. <br />By: By: <br />Engineer Owner <br />Date: Date: <br />00800-25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.