My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-280
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 3:11:30 PM
Creation date
10/5/2015 9:04:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/06/2009
Control Number
2009-280
Agenda Item Number
8.L.
Entity Name
Masci Corporation
Subject
Potable Water Main 77th. Street
Area
77th St.
Project Number
UCP 3086
Bid Number
2009064
Supplemental fields
SmeadsoftID
8783
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK CHANGE DIRECTIVE <br />INSTRUCTIONS <br />A. GENERAL INFORMATION <br />This document was developed for use in situations involving changes in the Work which, if not <br />processed expeditiously, might delay the Project. These changes are often initiated in the field and <br />may affect the Contract Price or the Contract Times. This is not a Change Order, but only a directive <br />to proceed with Work that may be included in a subsequent Change Order. <br />For supplemental instructions and minor changes not involving a change in the Contract Price or the <br />Contract Times a Field Order should be used. <br />B. COMPLETING THE WORK CHANGE DIRECTIVE FORM <br />Engineer initiates the form, including a description of the items involved and attachments. <br />Based on conversations between Engineer and Contractor, Engineer completes the following: <br />METHOD OF DETERMINING CHANGE, IF ANY, IN CONTRACT PRICE: Mark the method <br />to be used in determining the final cost of Work involved and the estimated net effect on the <br />Contract Price. If change involves an increase in the Contract Price and the estimated <br />amount is approached before the additional or changed Work is completed, another Work <br />Change Directive must be issued to change the estimated price or Contractor may stop the <br />changed Work when the estimates time is reached. If Work Change Directive is not likely to <br />change the Contract Price, the space for estimated increase (decrease) should be marked <br />"Not Applicable". <br />Once Engineer has completed and signed the form, all copies should be sent to Owner for <br />authorization because Engineer alone does not have authority to authorize changes in Price or <br />Times. Once authorized by Owner, a copy should be sent by Engineer to Contractor. Price and <br />Times may only be changed by Change Order signed by Owner and Contractor with Engineer's__ _ <br />recommendation. - - <br />Paragraph 10.03.A.2 of the General Conditions requires that a Change Order be initiated and <br />processed to cover any undisputed sum or amount of time for Work actually performed pursuant to <br />this Work Change Directive. <br />Once the Work covered by this directive is completed or final cost and times are determined, <br />Contractor should submit documentation for inclusion in a Change Order. <br />THIS IS A DIRECTIVE TO PROCEED WITH A CHANGE THAT MAY AFFECT THE CONTRACT <br />PRICE OR CONTRACT TIMES. A CHANGE ORDER, IF ANY, SHOULD BE CONSIDERED <br />PROMPTLY. <br />00800-26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.