Laserfiche WebLink
SECTION 01025 <br />MEASUREMENT AND PAYMENT <br />PART 1— GENERAL <br />1.01 GENERAL <br />Measurement and payment will be based upon work completed and accepted in <br />accordance with the Contract Documents. No separate payment will be made for <br />excavation, trenching, dewatering, M.O.T., backfilling, grading restoration, grassing, <br />paving, testing (leakage, pressure, bacteriological sample points, soil <br />compaction/density), or other incidental items of work not shown in the Agreement. <br />1.02 EQUIPMENT AND MATERIALS IN STORAGE <br />Partial payment for materials and equipment in proper storage at the site of the <br />work or other approved storage site will not be made. <br />1.03 MEASUREMENT <br />A. Mobilization: <br />Measurement shall be on a lump sum basis, and shall be limited to <br />the following maximum amounts: <br />ORIGINAL <br />CONTRACT AMOUNT ISI_ <br />MAXIMUM_AMDllNI OF <br />ROM MORE THAN <br />TO AND INCLUDING <br />ITEM FOR MOBILIZATION <br />0 <br />100,000 <br />3,000 <br />100,000 <br />500,000 <br />15,000 <br />500,000 <br />1,000,000 <br />30,000 <br />1,000,000 <br />2,000,000 <br />60,000 <br />2,000,000 <br />3,000,000 <br />90,000 <br />3,000,000 <br />4,000,000 <br />120,000 <br />4,000,000 <br />5,000,000 <br />125,000 <br />5,000,000 <br />6,000,000 <br />150,000 <br />6,000,000 <br />7,000,000 <br />175,000 <br />7,000,000 <br />10,000,000 <br />200,000 <br />10,000,000 <br />------------- <br />250,000 <br />Should the lump sum price bid for the item Mobilization exceed the maximum <br />permissible amount for this item, as specified herein, the bid price will be reduced <br />to the maximum permissible amount, and the reduced price will be used in correctly <br />determining the total price for comparison of bids received. The cost of video - <br />taping the pre -construction condition shall be included in the lump -sum cost of <br />mobilization. <br />B. Pipe: Measurement of pipe shall be computed using linear feet, as measured along <br />the centerline of the pipe installed (Except when included in lump sum bid items- <br />i.e.; Aerial crossing). No deduction will be made for the length of valves and fittings <br />installed in the line. Where the measurement terminates at a valve, bend, tee, or <br />01025-1 <br />