My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-280
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 3:11:30 PM
Creation date
10/5/2015 9:04:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/06/2009
Control Number
2009-280
Agenda Item Number
8.L.
Entity Name
Masci Corporation
Subject
Potable Water Main 77th. Street
Area
77th St.
Project Number
UCP 3086
Bid Number
2009064
Supplemental fields
SmeadsoftID
8783
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
from the FDEP Inspection reports shall be kept on the job site, and copies shall be <br />submitted monthly to the engineer. <br />1.02 NOTIFICATION <br />A. Indian River County: The Contractor is required to notify the Indian River County <br />Utilities Department 48 hours prior to initiating construction (Larry Brown, 772- <br />226-1827). The Contractor is required to notify the Indian River County Road and <br />Bridge Department 72 hours prior to blocking any county roads or detouring any <br />traffic (Jim Davis, P.E., 772-567-8000, Extension 1245) and the FDOT Maintenance <br />Engineer in Fort Pierce. <br />B. Utility Companies: Contractor shall notify the following known utility companies <br />in the area 48 hours prior to initiating construction: <br />SUNSHINE LOCATES (800) 432-4770 <br />Southern Bell Telephone, Bill Moore, (772) 468-5538 <br />Comcast, Craig Bowers, (772) 567-3444 Ext. 51 <br />FP&L, Paul Hess, (772) 337-7002 <br />City Gas Company, Glen "Bock" Kreinhagen, (561) 871-2552 ext.23 <br />Florida Gas & Transmission, Cecil Walker, (321) 288-8839 <br />C. The Contractor shall give the Engineer not less than seven (7) calendar days notice <br />of the time and place (or places) where he will start the work. <br />D. When the Contractor's excavating operations encounter prehistoric remains or <br />artifacts of historical or archeological significance, the operations shall be <br />temporarily discontinued in that area and the Engineer shall be notified. The <br />Engineer will consult archaeological authorities and determine the disposition of <br />the remains or artifacts. The Contractor agrees that he will make no claim for <br />additional payment or for extension of time because of any delays in or alteration <br />of his procedure due to removal of any such remains or artifacts. <br />PART 2 - PRODUCTS <br />Not applicable <br />PART 3 - EXECUTION <br />Not applicable <br />** END OF SECTION ** <br />1060-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.