My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-280
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 3:11:30 PM
Creation date
10/5/2015 9:04:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/06/2009
Control Number
2009-280
Agenda Item Number
8.L.
Entity Name
Masci Corporation
Subject
Potable Water Main 77th. Street
Area
77th St.
Project Number
UCP 3086
Bid Number
2009064
Supplemental fields
SmeadsoftID
8783
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.04 PRELIMINARY PROCEDURES <br />A. Owner or Engineer may initiate changes by submitting a proposal Request to <br />Contractor. Request will include the following: <br />1. Detailed description of the Change, Products, and location of the <br />change in the Project. <br />2. Supplementary or revised Drawings and Specifications. <br />3. The projected time span for making the change, and a specific <br />statement as to whether overtime work is, or is not, authorized. <br />4. A specific period of time during which the requested price will be <br />considered valid. <br />5. Such request is for information only, and is not an instruction to execute <br />the changes, nor to stop work in progress. <br />B• Contractor may initiate changes by submitting a written notice to Engineer, <br />containing: <br />1. Description of the proposed changes <br />2. Statement of the reason for making the changes. <br />3. Statement of the effect on the Contract Sum and the Contract Time. <br />4. Statement of the effect on the work of separate contractors. <br />S. Documentation supporting any changes in Contract Sum or Contract <br />Time, as appropriate. <br />1.05 CONSTRUCTION CHANGE AUTHORIZATION <br />A. In lieu of Proposal Request, Engineer may issue a "Work Directive Change" for <br />Contractor to proceed with a change for subsequent inclusion in a Change <br />Order. <br />B• Authorization will describe changes in the work, both additions and deletions, <br />with attachments of revised Contract Documents to define details of the <br />change. <br />C• Owner and Engineer will sign and date the Work Directive Change as <br />authorization for the Contractor to proceed with the Changes. <br />1.06 DOCUMENTATION OF PROPOSALS AND CLAIMS <br />A. Support each quotation for a lump sum proposal, and for each unit price which <br />has not previously been established, with sufficient substantiating data to allow <br />Engineer to evaluate the quotation. <br />B• On request, provide additional data to support time and cost computation <br />including the following: <br />01153-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.