My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-280
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 3:11:30 PM
Creation date
10/5/2015 9:04:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/06/2009
Control Number
2009-280
Agenda Item Number
8.L.
Entity Name
Masci Corporation
Subject
Potable Water Main 77th. Street
Area
77th St.
Project Number
UCP 3086
Bid Number
2009064
Supplemental fields
SmeadsoftID
8783
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Labor required. <br />2. Equipment required. <br />3. Products required: <br />a. Recommended source of purchase and unit cost. <br />b. Quantities required. <br />4. Taxes, insurance bonds. <br />5. Credit for work deleted from Contract, similarly documented. <br />6. Overhead and profit. <br />7. Justification for any change in Contract Time. <br />C. Support each claim for additional costs, and for work done on a time -and - <br />material / force account basis, with documentation as required for a lump sum <br />proposal, plus the following additional information: <br />1. Name of the Owner's authorization agent who ordered the work, and <br />date of the order. <br />2. Dates and time work performed, and by whom. <br />3. Time record, summary of hours worked, and hourly rates paid. <br />4. Receipts and invoices for: <br />a• Equipment used, listing dates and times of use. <br />b. Products used, listing quantities. <br />c• Subcontracts. <br />D. Document requests for substitutions for Products as specified in Section 01600. <br />1.07 PREPARATION OF CHANGE ORDERS <br />A. Engineer will prepare each Change Order. <br />B. Form: Change Order format provided in the Contract Documents. <br />C• Change Order will describe changes in the Work, both additions and deletions, <br />with attachments of revised Contract Documents to define details of change. <br />D. Change Order will provide an accounting of the adjustment in the Contract Sum <br />and in the Contract Time. <br />1.08 LUMP SUM / FIXED PRICE CHANGE ORDER <br />A. Content of Change Orders will be based on either: <br />1. Engineer's Proposal Request and Contractor's responsible Proposal as <br />mutually agreed upon between Owner and Contractor. <br />2. Contractor's Proposal for a change, as recommended by Engineer. <br />B. Owner and Engineer will sign and date the Change Order as authorization for <br />the contractor to proceed with the changes. <br />C• Contractor shall sign and date the Change Order to indicate agreement with the <br />terms therein. <br />01153-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.