My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-280
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 3:11:30 PM
Creation date
10/5/2015 9:04:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/06/2009
Control Number
2009-280
Agenda Item Number
8.L.
Entity Name
Masci Corporation
Subject
Potable Water Main 77th. Street
Area
77th St.
Project Number
UCP 3086
Bid Number
2009064
Supplemental fields
SmeadsoftID
8783
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Format of listings: The chronological order of the start of each item of <br />work. <br />C. Identification of listings: By major specification section numbers. <br />1.04 CONTENT OF SCHEDULES <br />A. Construction Progress Schedule shall: <br />1. Show the complete sequence of construction by activity. <br />2. Show the dates for the beginning and completion of each major <br />element of construction; specifically list: <br />a. Subcontractor work <br />b• Utility construction <br />C. Restoration <br />3. Show projected percentage of completion for each item, as of <br />the first day of each month. <br />LOS PROGRESS REVISIONS <br />A. Indicate progress of each activity to date of submission <br />B. Show changes occurring since previous submission of Schedule: <br />1. Major changes in scope. <br />2. Activities modified since previous submission. <br />3. Revised projections of progress and completion. <br />4. Other identifiable changes. <br />C. Provide a narrative report as needed to define: <br />1. Problem areas, anticipated delays, and the impact on the <br />schedule. <br />2. Corrective action recommended, and its effect. <br />3. The effect of changes on schedules of other prime contractors. <br />1.06 SUBMISSIONS <br />A. Submit initial schedules within ten (10) days after award of Contract; <br />Engineer will review schedules for information only. <br />B. Submit revised progress schedules with each application for payment. <br />01311 -2 <br />