My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-280
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 3:11:30 PM
Creation date
10/5/2015 9:04:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/06/2009
Control Number
2009-280
Agenda Item Number
8.L.
Entity Name
Masci Corporation
Subject
Potable Water Main 77th. Street
Area
77th St.
Project Number
UCP 3086
Bid Number
2009064
Supplemental fields
SmeadsoftID
8783
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01381 <br />AUDIO-VISUAL DOCUMENTATION <br />PART 1 -- GENERAL <br />1.01 DESCRIPTION OF WORK <br />Prior to commencing the Work, the Contractor shall have a continuous color <br />audio -video tape recording taken along the entire length of the Project to serve <br />as a record of preconstruction conditions. The preconstruction Swale elevations <br />shall be recorded at 100' intervals. <br />1.02 APPROVAL <br />No construction shall begin prior to review and acceptance of the tapes covering <br />the construction area by the Engineer. The Engineer shall have the authority to <br />reject all or any portion of a videotape not conforming to specifications and <br />order that it be redone at no additional charge. The Contractor shall reschedule <br />unacceptable coverage within five (5) days after being notified. The Engineer <br />shall designate those areas, if any, to be omitted from or added to the audio - <br />video coverage. Tape recordings shall not be made more than thirty (30) days <br />prior to beginning of construction in any area. All tapes and written records <br />shall become property of Owner. The tapes shall be delivered to the Owner as <br />soon as possible after recording. <br />1.03 QUALITY ASSURANCE <br />The Contractor shall engage the services of a professional electrographer. The <br />color audio -video tapes shall be prepared by a responsible commercial firm <br />known to be skilled and regularly engaged in the business of preconstruction <br />color audio -video tape documentation. <br />PART 2 -- PRODUCTS <br />2.01 GENERAL <br />All equipment, accessories, materials, and labor to perform this service shall be <br />furnished by the Contractor. <br />2.02 QUALITY <br />The total audio -video system shall reproduce bright, sharp, clear pictures with <br />accurate colors and shall have minimal distortion, tearing, rolls, or other <br />imperfections. The audio portion of the recording shall reproduce the <br />commentary of the camera operator with proper volume and clarity and be free <br />from distortion and interruptions. <br />01381 Audio -Visual Documentation.doc <br />01381-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.