My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-280
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 3:11:30 PM
Creation date
10/5/2015 9:04:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/06/2009
Control Number
2009-280
Agenda Item Number
8.L.
Entity Name
Masci Corporation
Subject
Potable Water Main 77th. Street
Area
77th St.
Project Number
UCP 3086
Bid Number
2009064
Supplemental fields
SmeadsoftID
8783
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01510 <br />TEMPORARY UTILITIES <br />PART 1 -- GENERAL <br />1.01 REQUIREMENTS INCLUDED <br />A. Furnish, install, and maintain temporary utilities required for <br />construction; remove on completion of entire project. <br />B. Provide temperature, ventilation, and lighting requirements, if <br />applicable, as specified in each individual section. <br />1.02 RELATED REQUIREMENTS <br />Section 01000: Summary of Work <br />1.03 REQUIREMENTS OF REGULATORY AGENCIES <br />A. Comply with National Electric Code. <br />B. Comply with federal, state, and local codes and regulations, and <br />with utility company requirements. <br />PART 2 -- PRODUCTS <br />2.01 MATERIALS (GENERAL) <br />Materials may be new or used, but must be adequate in capacity for the <br />required usage. They MUS__ create unsafe conditions, and MUST <br />NOT violate requirements of applicable codes and standards. <br />2.02 TEMPORARY ELECTRICITY AND LIGHTING <br />A. The Contractor must maintain power to all existing buildings and <br />areas. <br />B. The Contractor is responsible for providing and paying for all <br />Power required for his operations. Contractor shall make <br />arrangements with Owner for temporary power. <br />C. Contractor is responsible for arranging power for his office <br />trailers(s), power tools, etc., at his own expense. The Contractor <br />shall pay the costs of all power used. <br />01510-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.