Laserfiche WebLink
9 <br />D. Provide POWER CENTERS for miscellaneous tools and <br />equipment used in the work: <br />1 Weatherproof distribution box with minimum of four 20 - <br />amp., 120 -volt grounded outlets. <br />2. Locate so that power is available at any point of use with <br />minimum 100 -foot CONSTRUCTION -TYPE power cords. <br />3. Provide circuit breaker protection for each outlet. <br />E. Provide adequate artificial lighting for all areas of work, when <br />natural light is not adequate for work, and for areas accessible to <br />persons other than Contractor's employees. <br />F. If Contractor requires service other than specified above, he shall <br />arrange for, provide maintenance, and pay all costs incurred. <br />2.03 TEMPORARY !MATER <br />Contractor shall make arrangements with Owner for all temporary water <br />at the project site. Contractor shall pay for all temporary water required <br />for his operations. <br />2.04 TEMPORARY SANITARY FACILITIES <br />A. Contractor shall provide temporary sanitary facilities in compliance <br />with laws and regulations. <br />B. Contractor shall provide for regular service, cleaning, and <br />maintenance of temporary facilities and enclosures. <br />PART 3 -- EXECUTION <br />3.01 GENERAL <br />A. Comply with applicable requirements specified in Section 02670 — <br />Submersible Wastewater Pumping Station, as well as state and <br />local codes. <br />B. Maintain and operate systems to ensure continuous service. <br />01510-2 <br />