2.03 TEMPORARY DUST CONTROL <br />Dust formed as a result of the construction shall be controlled by the <br />Contractor. Cleaning of work areas and application of dust control materials are <br />the most effective methods of dust control. <br />2.04 TEMPORARY WATER CONTROL <br />A. The flow of water through the construction site shall be controlled by <br />the Contractor such that it does not damage any constructed items; <br />however, it shall be diverted and channeled to effectively leave the site <br />as soon as possible. Puddling and ponding on the site is not permitted. <br />B. Water shall be controlled such that it does not enter excavated areas, <br />nor is deposited on or against constructed features. <br />2,05 TEMPORARY DEBRIS CONTROL <br />A. Provision shall be made by each Contractor to have available adequate <br />containers to hold any and all debris that is to be generated from the <br />project. Containers should be covered to prevent wind blowing paper, <br />plastic, and lightweight products around and off the site. <br />B. Instructions shall be given to personnel to utilize the trash containers. <br />Containers shall be placed in convenient places at the site. <br />C. At least once per week, a thorough cleaning of.trash and debris shall be <br />made at the construction site. An acceptable method of disposal shall <br />be employed. <br />** END OF SECTION ** <br />01560 Temporary Controls.doc <br />01560-2 <br />