My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-280
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 3:11:30 PM
Creation date
10/5/2015 9:04:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/06/2009
Control Number
2009-280
Agenda Item Number
8.L.
Entity Name
Masci Corporation
Subject
Potable Water Main 77th. Street
Area
77th St.
Project Number
UCP 3086
Bid Number
2009064
Supplemental fields
SmeadsoftID
8783
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. When project is alteration and additional work, DO NOT use materials <br />and equipment removed from existing structure, except as specifically <br />allowed by notation or indication by Contract Documents. <br />1.04 WORKMANSHIP <br />A. Comply with industry standards except when more restrictive <br />tolerances or specified requirements indicate more rigid standards or <br />more precise workmanship. <br />B. Perform work by persons qualified to produce workmanship of specified <br />quality. <br />C. Secure products in place with positive anchorage devises designed and <br />sized to withstand stresses, vibration, and rocking. <br />1.05 MANUFACTURER'S INSTRUCTIONS <br />A• When work is specified to comply with manufacturer's printed <br />instructions, obtain and distribute copies to persons involved, and <br />maintain one set at job site in field office. <br />B. Perform work in accordance with manufacturer's instructions and <br />specified requirements. <br />C. Should a conflict exist between Specifications and manufacturer's <br />instructions, consult with Engineer. <br />1.06 TRANSPORTATION AND HANDLING <br />A. Arrange deliveries of products in accordance with construction <br />schedules; coordinate to avoid delay of progress, conflict with work and <br />with conditions at the site. <br />B. Transport products by methods to avoid product damage; deliver in <br />undamaged condition in manufacturer's unopened containers or <br />packaging, dry. <br />C. Provide equipment and personnel to handle product by methods to <br />prevent soiling or damage. <br />D. Promptly inspect shipments to assure that products comply with <br />requirements, quantities are correct and products are undamaged. <br />01600 Material and Equipment.doc <br />01600-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.