Laserfiche WebLink
D. When project is alteration and additional work, DO NOT use materials <br />and equipment removed from existing structure, except as specifically <br />allowed by notation or indication by Contract Documents. <br />1.04 WORKMANSHIP <br />A. Comply with industry standards except when more restrictive <br />tolerances or specified requirements indicate more rigid standards or <br />more precise workmanship. <br />B. Perform work by persons qualified to produce workmanship of specified <br />quality. <br />C. Secure products in place with positive anchorage devises designed and <br />sized to withstand stresses, vibration, and rocking. <br />1.05 MANUFACTURER'S INSTRUCTIONS <br />A• When work is specified to comply with manufacturer's printed <br />instructions, obtain and distribute copies to persons involved, and <br />maintain one set at job site in field office. <br />B. Perform work in accordance with manufacturer's instructions and <br />specified requirements. <br />C. Should a conflict exist between Specifications and manufacturer's <br />instructions, consult with Engineer. <br />1.06 TRANSPORTATION AND HANDLING <br />A. Arrange deliveries of products in accordance with construction <br />schedules; coordinate to avoid delay of progress, conflict with work and <br />with conditions at the site. <br />B. Transport products by methods to avoid product damage; deliver in <br />undamaged condition in manufacturer's unopened containers or <br />packaging, dry. <br />C. Provide equipment and personnel to handle product by methods to <br />prevent soiling or damage. <br />D. Promptly inspect shipments to assure that products comply with <br />requirements, quantities are correct and products are undamaged. <br />01600 Material and Equipment.doc <br />01600-2 <br />