My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-280
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 3:11:30 PM
Creation date
10/5/2015 9:04:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/06/2009
Control Number
2009-280
Agenda Item Number
8.L.
Entity Name
Masci Corporation
Subject
Potable Water Main 77th. Street
Area
77th St.
Project Number
UCP 3086
Bid Number
2009064
Supplemental fields
SmeadsoftID
8783
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.07 STORAGE AND PROTECTION <br />A. Store products in accordance with manufacturer's instructions, with <br />seals and labels intact and legible. <br />B. Store sensitive products in weather -tight enclosures; maintain within <br />temperatures and humidity ranges recommended/required by <br />manufacturer's instructions. <br />C. For exterior storage of fabricated products, place on sloped supports <br />above ground. Cover products subject to deterioration with impervious <br />sheet covering; provide ventilation to avoid condensation. <br />D. Store loose granular materials on solid surfaces in a well -drained area; <br />prevent mixing with foreign matter. <br />E. Arrange storage to provide access for inspection. Periodically inspect to <br />assure products are undamaged, and are maintained under required <br />conditions. <br />F. After installation, provide coverings to protect products from damage <br />from traffic and construction operations, remove when no longer <br />needed. <br />1.08 PRODUCT OPTIONS <br />A. Within 30 days after date of Contract, submit complete list of major <br />products proposed, with name of manufacturer, trade name and model. <br />B. Options: <br />1. Products specified only be reference standard: Any product <br />meeting that standard. <br />2. Product specified by naming several manufacturers: Product of <br />any named manufacturer meeting specifications. <br />3. Products specified by naming one or more manufacturers and <br />"or equal": Submit a request for substitution for any <br />manufacturer not specifically named. <br />1.09 SUBSTITUTIONS <br />A. Only within 30 days after date of Contract will Engineer consider <br />requests from Contractor for substitutions. Subsequently, substitutions <br />will be considered only when a product becomes unavailable due to no <br />fault of the Contractor. <br />01600 Material and Equipment.doc <br />01600-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.