My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-280
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 3:11:30 PM
Creation date
10/5/2015 9:04:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/06/2009
Control Number
2009-280
Agenda Item Number
8.L.
Entity Name
Masci Corporation
Subject
Potable Water Main 77th. Street
Area
77th St.
Project Number
UCP 3086
Bid Number
2009064
Supplemental fields
SmeadsoftID
8783
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Document each request with complete data, drawings and samples as <br />appropriate, substantiating compliance of proposed substitution with <br />Contract Documents including: <br />1. Comparison of the qualities of the proposed substitution with <br />the specified. <br />2. Changes required in other elements of the work because of the <br />substitution. <br />3. Effect on the construction schedule. <br />4. Cost data comparing the proposed substitution with the <br />product specified. <br />5. Any required license fees or royalties <br />6. Availability of maintenance service, and the source replacement <br />materials. <br />C. Request constitutes a representation that Contractor: <br />i. Has investigated proposed product and determined that it <br />meets or exceeds, in all respects, specified product. <br />2. Will provide the same warranty for substitution as for specified <br />product. <br />3. Will coordinate installation and make other changes which may <br />be required for work to be complete in all respects. <br />4. Waives claims for additional costs which may subsequently <br />become apparent. <br />D. Substitutions will not be considered when they are indicated or implied <br />on Shop Drawing or Product Data submittals without separate written <br />request, or when acceptance will require substantial revision of <br />Contract Documents. <br />E. Engineer will review to determine acceptability of proposed <br />substitution, and will notify Contractor of acceptance or rejection in <br />writing within a reasonable time. <br />PART 2 -- PRODUCTS <br />Not applicable <br />PART 3 -- EXECUTION <br />Not applicable <br />** END OF SECTION ** <br />01600-4 <br />01600 Material and Equipment.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.