My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-280
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 3:11:30 PM
Creation date
10/5/2015 9:04:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/06/2009
Control Number
2009-280
Agenda Item Number
8.L.
Entity Name
Masci Corporation
Subject
Potable Water Main 77th. Street
Area
77th St.
Project Number
UCP 3086
Bid Number
2009064
Supplemental fields
SmeadsoftID
8783
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Contractor shall remedy the deficiencies in the work, and shall send a <br />second written notice of substantial completion to Engineer <br />3. Engineer will re -inspect the work <br />D. When Engineer concurs that the work is substantially complete, he will: <br />1. Prepare a Certificate of Substantial Completion, accompanied by a list of <br />items to be completed or corrected <br />2. Submit the Certificate to Owner and Contractor for their written <br />acceptance of the responsibilities assigned to them in the certificate. <br />1.03 FINAL INSPECTION <br />A. When Contractor considers the work is complete, he shall submit written <br />certification that: <br />1. Contract Documents have been reviewed <br />2- Work has been inspected for compliance with Contract Documents <br />3. Work has been completed in accordance with Contract Documents <br />4. Equipment and systems have been tested in the presence of the <br />Owner's representative and are operational <br />5. Equipment and systems instructions to Owner's personnel have been <br />completed in accordance with Section 01730 <br />6. Work is completed and ready for final inspection <br />B. Engineer will make an inspection to verify the status of completion with <br />reasonable promptness after receipt of such certification. <br />C. Should Engineer consider that the work is incomplete or defective: <br />1. Engineer will promptly notify the Contractor, in writing, listing the <br />incomplete or defective work. <br />2. Contractor shall take immediate steps to remedy the stated <br />deficiencies, and send a second written certification to Engineer that <br />the work is complete. <br />3. Engineer will re -inspect the work <br />D. When Engineer finds that the work is acceptable under the Contract <br />Documents, he shall request the Contractor to make closeout submittals. <br />1.04 RE -INSPECTION FEES <br />Should the Engineer perform re -inspection due to failure of the work to comply with the <br />claims of status of completion made by the Contractor, Contractor will compensate <br />Engineer/Owner for such additional services. <br />w• <br />01700 Contract Close-out.doc R <br />01700-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.