Laserfiche WebLink
Section 02000 <br />WATER AND WASTEWATER UTILITY STANDARDS <br />PART 1-- GENERAL <br />1.01 REQUIREMENTS INCLUDED <br />A. Obtain a copy of utility standards and keep at job site, bearing the title <br />"I.R.C.D.U.S. Water and Wastewater Utility Standards", July 2007 or latest <br />version — herein after called "Reference Specifications" <br />B. Installation of all water and wastewater utility facilities/infrastructure <br />shall be in accordance with the reference standards, drawings and other <br />specifications in "Division 2 — Site Work. <br />1.02 RELATED REQUIREMENTS <br />A. In other parts of the contract documents; contractor is required to obtain <br />a copy of the reference specifications, and during construction, comply <br />with the reference specifications. <br />1. Section 00020 Advertisement for Bids <br />2. Section 00100 Instruction to Bidders <br />3. Section 00310 Bid Form <br />B. Specified in other sections: <br />1. Section 00530 EJCDC — Agreement between owner and <br />contractor; article 8. Contract documents; paragraph 8.6 <br />2. Section 00800 Supplementary conditions; paragraph SC — 3.03.13.2 <br />Coordination of plans, specifications and special provisions. <br />02000-1 <br />