Laserfiche WebLink
PART 2-- PRODUCTS <br />2.01 All materials, equipment (products) used in the installation of the work <br />shall be in accordance with the reference specifications, and in <br />accordance with specifications found in other parts of the contract <br />documents, including: <br />A. Drawings <br />B. Other sections of "Division 2 — Site Work" <br />Section 02001— Conversion Method <br />Section 02002 — Cleaning of In -Service Piping Systems <br />Section 02115 - Tree Protection and Trimming <br />Section 02401— Dewatering <br />Section 02485 — Grassing <br />Section 02576 — Pavement, Sidewalk, and Driveway Replacement <br />PART 3 - EXECUTION <br />3.01 All installation methods & handling of material ( the execution of the <br />work) shall be in accordance with the reference specifications, and in <br />accordance with specifications found in the other parts of the contract <br />documents, including: <br />DOCUMENTS: <br />A. Drawings <br />B. Other sections of division 2 — site work <br />Section 02001— Conversion Method <br />Section 02002 — Cleaning of In -Service Piping Systems <br />Section 02115 — Tree Protection and Trimming <br />Section 02401— Dewatering <br />Section 02485 — Grassing <br />Section 02576 — Pavement, Sidewalk, and Driveway Replacement <br />02000-2 <br />