My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/15/1981
CBCC
>
Meetings
>
1980's
>
1981
>
4/15/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:17 AM
Creation date
6/11/2015 1:02:33 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/15/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I- <br />i'R 15 1991 <br /><. 1r Firm FHA 424.7 <br />(Rev. 8-22.69) <br />book t <br />t1:�i-F't:D <br />STAIES ES DEPAK1'Mi N -V OF AGhM.J.-x ucit_ <br />FARNIL:RS 11011E ADMINISTRATION O►tOL11 No. 2 <br />CONTRACT 6I1ANGF. ORDER <br />Phase II - Gifford Area Sewage System Improvements <br />CONTnACT FOR <br />OWNER <br />OAT <br />STAT E Florida <br />COUNTY <br />Indian River <br />To ..Q r.i yeways =--Inc ....... ...... ........................................................................ _....._.._-_.._.....—. __ ------------ ---- You are hereby requested to comply wit4 the folio -sing changes from the contract plans and specifications: <br />Description of Changes <br />(Supplemental Plans and Specifications Attached) <br />1. Work shall include replacing broken 8 inch $ <br />Vitrified Clay Pipe (VCP) with 8 inch PVC pipe. <br />Connection between existing VCP and PVC pipe shall <br />be made with Mission couplings. <br />2. Work shall include removing 8 inch Vitrified <br />Clay Pipe (VCP), backfilling low area and compact- <br />ing, and installing 12 feet of 8 inch PVC pipe in <br />same section connected with Mission couplings. <br />TOTALS S <br />NET CHANGE IN CONTRACT PRICE. I S <br />DECREASE INCREASEin Contract Price in Contract Price <br />M <br />P <br />500.00 <br />500.00 <br />1,000.00 <br />1,000.00 <br />JUSTIFICATION':. Sand infiltration -into the' gravity sewer system has created problems <br />in the existing pumping station. Such problems should be remedied prior to construc- <br />tion of the new pumping station facility, and the installation of new pumping equipment. <br />The amount of the Contract will be ( ?aXM (Increased) By The Sum Of: One Thousand and <br />00/100------------------------------------------------ ( 1,000-00 <br />Dollars S ) - <br />The Contract Total Including this and previous Change Orders Will Be: Three Hundred Sixty Nine Thousand <br />Seven Hundred Thirtv Six and 85/100------------------ Dollars(S 369,736.85 <br />The Contract Period Provided for Completion Will BeXtfiX)J?4XX ( 4)XA?I4C'iWYM};(Unchanged): -0- Days <br />This document -will become a supplement to the contract and all provisions will apply hereto. <br />Requested <br /><� (Owner) <br />Recommended <br />L' (Owner's Architect/Engineer) <br />Accepted <br />a (Contractor) <br />Approved By FHA <br />(Narne a►nf Title) <br />tr U.S. G.P.U. 1976-665-664/1934 REG.k6 <br />Poci(ion 6 <br />6 <br />(Date) <br />(Date) <br />(D ate) <br />(Date) <br />FNA 424.7 (Rev. 8-22-0) <br />
The URL can be used to link to this page
Your browser does not support the video tag.