Laserfiche WebLink
1 <br />a (i.e. hand remove or lightly spray with SJRWMD approved herbicides) and keep <br />the areas free of exotics. <br />Oq. The County will not answer questions about this project after October 6, 2008. <br />r HydroMentia, Inc. will prepare a cost for its services and equipment and <br />thcost <br />(� should be available during the week of September 29, 2008. HydroMentia wil also <br />�J try to provide an estimate of the weight of the materials it will supply. <br />s. Hydromentia's website is http://www, hi/rirnmn-+ia.com/ <br />t. Q: Is grading only at the A TS site? <br />DA: The entire site shall be graded. Refer to the Construction Drawings. <br />u. Q: Was the ATS designed to balance cut and fill? <br />(� A: No <br />v. For information regarding disposal of debris, refer to pay items in the Bid Form and <br />also refer to Section 02220 - Excavation and Backfill. <br />w. Q: Do the Survey and Topographic Drawings reflect all that is current on the site <br />surface and can bidders use an excavator to explore the site? <br />A: The eight Survey and Topographic Drawings in the bid documents contain the <br />most current information available. Bidders are directed to Section 00200 - <br />Instruction to Bidders, Article 4. <br />X Q: Will the County direct purchase any materials or equipment? <br />A: See Section 00200 - Instructions to Bidders Article 22 and Section 0 <br />Form Articles 4.02 and 4.03. 0310 Bid <br />U Y Q: Can the bid form be compressed to a lump sum and is th <br />spread sheet? e bid form an excel <br />A: The Bid Form is a Word document and all items must be submitted as specified <br />in Section 00310. <br />z: Q: Describe the flow of the project. <br />A: Stormwater is pumped from the Lateral D Canal to the site headworks, <br />distributed evenly over the ATS surface, collected at the harvest facility, discharged <br />to the initial polishing pond, routed through the intermediate and final polishing <br />ponds and the wood stork pond, and discharged to the Lateral C Canal. <br />aa: Q: Does the Indian River Farms Water Control District have the right to reroute the <br />flow? <br />A: Yes. See Section 01013 - INDIAN RIVER FARMS WATER CONTROL <br />DISTRICT OPERATIONS DURING CONSTRUCTION. <br />F:\Public WorkslKefthM\Stormwater Projects\Egret Marsh REVIAddendurn No. 1 - 7 EGRET MARS <br />30-2008.doc SED\Bid DocumentslAddendums\Addendum #1\Addendum #1 - 9- H <br />0 <br />