Laserfiche WebLink
C <br />bb: Q: Why is bypass pumping not included in the contract? Q <br />A: All Contractor operations are not listed in the Bid Form but must be included as <br />necessary to properly construct the project. r-, <br />cc: Q: What equipment is necessary for handling the ATS materials supplied by <br />HydroMentia? <br />A: This information will be provided by the subcontractor with its costs. <br />Item No. 8 — Site Visit to HydroMentia's existing Taylor Creek Algal Turf Scrubber <br />System Installation <br />HydroMentia, Inc. will provide site tours of its Taylor Creek Algal Turf Scrubber system <br />site on Friday, October 3, 2008 at 10:30 AM and Tuesday, October 7 at 10:30 AM. <br />Tours will not be available on any other dates or times. All individuals need to contact <br />the Ocala Corporate Office to confirm attendance and for directions. Please call 352- <br />237-6145 ext. 200. <br />Article No. 9 — Pre -Bid Conference Sign -In Sheet <br />A copy of the Pre -Bid Conference Sign -in Sheet is included herein. <br />Item No. 10 —Clarification Regarding GeoSyntec Consultants <br />Paragraph 27.05 of Section 00200 — Instructions to Bidders, incorrectly states that <br />HydroMentia, Inc. will retain GeoSyntec Consultants as a subcontractor to provide <br />quality assurance and construction quality control activities during construction of the <br />Algal Turf Scrubber. Correction — The Contractor shall contract directly with GeoSyntec <br />Consultants to provide said services. <br />Article No. 11 - Attachments to this Addendum <br />1. "Permittee's Affidavit Regarding Pollution Leaving the Construction Site" <br />2. Indian River County Type B Stormwater Management System Permit No. <br />2006100156-62049 <br />3. Revised Electrical Drawings (15 sheets) <br />4. Revised Electrical Specifications (8 specifications) <br />5. Pre -Bid Conference Sign -In Sheet. <br />+ + END OF ADDENDUM NO. 1 + + <br />Addendum No. 1 - 8 EGRET MARSH <br />FAPublic Works\KeithM\Stormwater Projects\Egret Marsh - REVISED\Bid Documents\Addendums\Addendum #1\Addendum #1 - 9- <br />30-2008.doc <br />