EGRET
<br />MARSH STORMWATER PARK
<br />PHASE I BiD
<br />TABULATION FORM
<br />ITEMContinued
<br />DESCRIPTION
<br />No.
<br />4.0Landscape
<br />Items
<br />QUANTITY UNIT
<br />TOTAL
<br />UNI F,1:1RICE1 AMOUNT
<br />4.01
<br />Removal of Exotics from entire site (less Wood
<br />Stork Habitat) Including disposal, as specified in
<br />Section 02240.
<br />1 LS
<br />�r , c
<br />9�,Ct;G•
<br />4.02
<br />Two -Year Landscape Items Maintenance Period,
<br />including temporary irrigation, any plant
<br />re lacement, and wildlife rotection.
<br />2 Year,
<br />Sa o,
<br />3 76,b75.
<br />4.03
<br />Five -Year Exotic Elimination Period, including
<br />monthly removal'of Exotics and wildlife
<br />Protection.
<br />5 Year
<br />Zli%G- �� /o ow o0
<br />4.04
<br />Furnish, Install, and Maintain during
<br />construction, all #1 Areas with Wildflower and
<br />Native Grass Seed Mix for u land areas
<br />219,720 SF
<br />O 7-3
<br />4.05
<br />Furnish, Install, and Maintain during
<br />35,720 SF
<br />4.06
<br />construction all #2 Areas with Spa bakers.
<br />Furnish, Install, and Maintain during
<br />0.31
<br />construction, all #3 Areas with Wetland Type
<br />Wildflower and Native Grass Seed Mix.
<br />30,520 SF
<br />o, Z3
<br />4.07
<br />Furnish, Install, and Maintain during
<br />construction, all #4 Areas with Muhlenbergia
<br />capillaries
<br />59 970 SF
<br />4.08
<br />Furnish, Install, and Maintain during
<br />29 810 SF
<br />4.09
<br />construction, all 45 Areas with S artina atens
<br />Furnish, Install, and Maintain during
<br />D • 3 qZ'-11/G
<br />construction, atl #6 Areas with Helianthus debilis
<br />dune sunflower
<br />5,690 SF
<br />6,31 j 763,yG
<br />✓
<br />4.10
<br />Furnish, Install, and Maintain during
<br />construction, all #7 Areas with Zone 1 plantings
<br />perSection 'A'onDrawjn C1a
<br />26,070 SF
<br />6,31 SC)S J 7
<br />4.1 T
<br />Furnish, Install, and Maintain during
<br />construction, all #8 Areas with plantings per
<br />section Won Drawing C18
<br />13,300 SF
<br />6,31 g1z3, o,
<br />4.12
<br />Furnish and install i i Cypress trees. 3r entire
<br />site as shown on the Drawings, Including
<br />maintenance Burin 1 construction and bracing.
<br />66 EA
<br />3577, `5 a6� pj0 oa
<br />4.13
<br />Furnish and install Red Bay trees for entire site
<br />as shown on the Drawings, including
<br />maintenance during construction and bracin
<br />30 EA
<br />oc
<br />1/ 456
<br />4.14
<br />,
<br />Furnish and install Live Oaktrees for entire site
<br />as
<br />shown on the Drawings, including=;
<br />maintenance during construction and bracin
<br />23 EA
<br />c�
<br />1//0 • q y30'
<br />4.15 Furnish
<br />.
<br />and install Cabbage Palm trees (or entire
<br />�l4.16
<br />site
<br />as shown on the Drawings, including
<br />maintenance durin construction and bracin .
<br />57
<br />Furnish
<br />and install Slash Pine trees for entire siteas
<br />maintenance
<br />shown on the Drawings, including
<br />durin construction and bracin
<br />144.17
<br />;EA
<br />aS �C
<br />Fumish
<br />.
<br />and install Maple trees for entire site as
<br />shown
<br />on the Drawings, including maintenanceduring construction and bracing.
<br />21
<br />°� �-7/S, w
<br />Latest Rev. 9/29/2008 ADDENDUM NO. 2 • o0310. 8 EGRET
<br />FAPublic Works\KeithM\Storrnwater Projects\Egret Marsh • REVISED\Bid Dooumenls�Addendums\Addendum #2\0031 0MARS
<br />2\03OS Bid Form
<br />Egret Marsh - REVISED - ADDENDUM #2.doc
<br />
|