EGRET MARSH STORMWATER PARK PHASE I BID TABULATION FORM
<br />Continued
<br />ITEM
<br />DESCRIPTION
<br />TOTAL
<br />No.
<br />QUANTITY
<br />UNIT
<br />UNIT PRICE
<br />AMOUNT
<br />4,1 g
<br />Furnish and install Laurel Oak trees for entire
<br />site. as shown on the Drawings, Including
<br />12
<br />EA
<br />, 00 o�
<br />366 °r
<br />mantenance durinq construction and bracing.
<br />4,19
<br />Furnish and install Water Oak trees for entire site
<br />as shown on the Drawings, including
<br />11
<br />EA
<br />maintenance during construction and bracing.
<br />4.20
<br />Furnish, Install, and Maintain during
<br />construction, Bahia Sod as shown on the
<br />Drawings, including ATS site and Pumping
<br />12,450
<br />SY
<br />i
<br />Station D Site.
<br />4.21 a
<br />Furnish, install, and maintain during construction,
<br />all Littoral Zone
<br />2,960
<br />SY
<br />Z S S
<br />oc
<br />Plantings in the PolishingPonds
<br />75- V-9
<br />4.21 b
<br />Furnish, install, and maintain during construction,
<br />the Pickerelweed at the north end of the Final
<br />262
<br />SY
<br />yd
<br />G
<br />(� �-
<br />Polishinq Pond
<br />z•
<br />4.22
<br />Furnish, install, and maintain during construction,
<br />the plantings in the peninsular area inside the
<br />1
<br />LS
<br />Final Polishing Pond as indicated on Drawings
<br />C10 and C19.
<br />4.23
<br />Furnish, install, and maintain during construction,
<br />all plantings in the Wood Stork Habitat Area as1
<br />LS
<br />CC
<br />34000. °C
<br />indicated on Drawin s 1 C10, and C19.
<br />i
<br />D Subtotal Items 4.01 through 4,23 53 72
<br />2 y�.
<br />5.0 ALTERNATE BID < s
<br />5,01
<br />Final Polishing Pond Submersible Pumping
<br />Station, including Intake Structure S-6, 42 Inch
<br />R.C.P. Influent Piping, discharge piping to 24"
<br />Force Main, Wetwell, Valve Vaults, Electrical
<br />and Controls, Equipment,
<br />1
<br />LS
<br />K
<br />2 �/s, fib&
<br />G oi_
<br />ZJ, /6p
<br />Air Release Valve,
<br />Access Covers, Valves, Fittings, Connections,
<br />•
<br />.
<br />and Related Incidentals: Complete in -Place and
<br />read for Continuous Use.
<br />E
<br />Subtotal Item 5.01k-1
<br />gf r
<br />7
<br />�+fa s A ... �
<br />h,A �.. ! b § �o F ?!'� +I sygRsk�>.
<br />�""3iy!'v. � ,;�..- � � �a��aia QF''�¢ j'�ix
<br />I
<br />GRAND TOTAL BASE BID ITEMS:AW
<br />4Y� fF i4 k " P'I'.A{',.Mq
<br />r '�.�.;' �t�3
<br />- �w=14-
<br />5�,ax
<br />fa,L� +�t rr rf , �x�fr
<br />r� , Marr
<br />!
<br />14- ., ..
<br />R
<br />f
<br />'t
<br />GRAND TOTAL BASE BID PLUS
<br />ALTERNATE BID ITEMS:
<br />,IP4
<br />A B C, D& E
<br />5.01 Bidder shall complete the Work in accordance with the Contract Documents for the
<br />price(s) contained in the Bid Schedule:
<br />A. The Discrepancies between the multiplication of units of Work and unit prices will be
<br />resolved in favor of the unit prices. Discrepancies between the indicated sum of any
<br />column of figures and the correct sum thereof will be resolved in favor of the correct
<br />sum. Discrepancies between words and figures will be resolved in favor of the words.
<br />Latest Rev. 9/29/2008 ADDENDUM NO. 2 - 00310 - 7 EGRET MARSH
<br />FAPublic Works\KelthM%Stonnwater Projects\Egret Marsh - REVISED\Bld Documents\Addendums\Addendum #2\00310. Bid Form
<br />Egret Marsh - REVISED - ADDENDUM #2.doc
<br />
|