Laserfiche WebLink
EGRET MARSH STORMWATER PARK PHASE I BID TABULATION FORM <br />Continued <br />ITEM <br />DESCRIPTION <br />TOTAL <br />No. <br />QUANTITY <br />UNIT <br />UNIT PRICE <br />AMOUNT <br />4,1 g <br />Furnish and install Laurel Oak trees for entire <br />site. as shown on the Drawings, Including <br />12 <br />EA <br />, 00 o� <br />366 °r <br />mantenance durinq construction and bracing. <br />4,19 <br />Furnish and install Water Oak trees for entire site <br />as shown on the Drawings, including <br />11 <br />EA <br />maintenance during construction and bracing. <br />4.20 <br />Furnish, Install, and Maintain during <br />construction, Bahia Sod as shown on the <br />Drawings, including ATS site and Pumping <br />12,450 <br />SY <br />i <br />Station D Site. <br />4.21 a <br />Furnish, install, and maintain during construction, <br />all Littoral Zone <br />2,960 <br />SY <br />Z S S <br />oc <br />Plantings in the PolishingPonds <br />75- V-9 <br />4.21 b <br />Furnish, install, and maintain during construction, <br />the Pickerelweed at the north end of the Final <br />262 <br />SY <br />yd <br />G <br />(� �- <br />Polishinq Pond <br />z• <br />4.22 <br />Furnish, install, and maintain during construction, <br />the plantings in the peninsular area inside the <br />1 <br />LS <br />Final Polishing Pond as indicated on Drawings <br />C10 and C19. <br />4.23 <br />Furnish, install, and maintain during construction, <br />all plantings in the Wood Stork Habitat Area as1 <br />LS <br />CC <br />34000. °C <br />indicated on Drawin s 1 C10, and C19. <br />i <br />D Subtotal Items 4.01 through 4,23 53 72 <br />2 y�. <br />5.0 ALTERNATE BID < s <br />5,01 <br />Final Polishing Pond Submersible Pumping <br />Station, including Intake Structure S-6, 42 Inch <br />R.C.P. Influent Piping, discharge piping to 24" <br />Force Main, Wetwell, Valve Vaults, Electrical <br />and Controls, Equipment, <br />1 <br />LS <br />K <br />2 �/s, fib& <br />G oi_ <br />ZJ, /6p <br />Air Release Valve, <br />Access Covers, Valves, Fittings, Connections, <br />• <br />. <br />and Related Incidentals: Complete in -Place and <br />read for Continuous Use. <br />E <br />Subtotal Item 5.01k-1 <br />gf r <br />7 <br />�+fa s A ... � <br />h,A �.. ! b § �o F ?!'� +I sygRsk�>. <br />�""3iy!'v. � ,;�..- � � �a��aia QF''�¢ j'�ix <br />I <br />GRAND TOTAL BASE BID ITEMS:AW <br />4Y� fF i4 k " P'I'.A{',.Mq <br />r '�.�.;' �t�3 <br />- �w=14- <br />5�,ax <br />fa,L� +�t rr rf , �x�fr <br />r� , Marr <br />! <br />14- ., .. <br />R <br />f <br />'t <br />GRAND TOTAL BASE BID PLUS <br />ALTERNATE BID ITEMS: <br />,IP4 <br />A B C, D& E <br />5.01 Bidder shall complete the Work in accordance with the Contract Documents for the <br />price(s) contained in the Bid Schedule: <br />A. The Discrepancies between the multiplication of units of Work and unit prices will be <br />resolved in favor of the unit prices. Discrepancies between the indicated sum of any <br />column of figures and the correct sum thereof will be resolved in favor of the correct <br />sum. Discrepancies between words and figures will be resolved in favor of the words. <br />Latest Rev. 9/29/2008 ADDENDUM NO. 2 - 00310 - 7 EGRET MARSH <br />FAPublic Works\KelthM%Stonnwater Projects\Egret Marsh - REVISED\Bld Documents\Addendums\Addendum #2\00310. Bid Form <br />Egret Marsh - REVISED - ADDENDUM #2.doc <br />