My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-383
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-383
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 3:38:35 PM
Creation date
10/5/2015 9:04:20 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/18/2008
Control Number
2008-383
Agenda Item Number
12.I.2
Entity Name
H & D Construction
Subject
Eagret Marsh Stormwater Park
Area
Egret Marsh Stormwater Park
Project Number
0430
Bid Number
2008076
Supplemental fields
SmeadsoftID
8759
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />The acceptance by the CONTRACTOR of final payment shall be and shall operate as a <br />release to the OWNER from all claims and all liability to the CONTRACTOR other than <br />claims in stated amounts as may be specifically excepted by the CONTRACTOR for all <br />things done or furnished in connection with the work under this Contract and for every act <br />and neglect of the OWNER and others relating to or arising out of the work. Any payment, <br />however, final or otherwise, shall not release the CONTRACTOR or its sureties from any <br />obligations under the Contract Documents or the Payment and Performance Bonds. <br />n 6.05 Final Payment <br />A. Upon final completion and acceptance of the Work in accordance with paragraph 14.07 of <br />the General Conditions (and Supplementary Conditions if applicable), OWNER shall pay the <br />remainder of the Contract Price as recommended by ENGINEER and ENGINEER's <br />CONSULTNAT as provided in said paragraph 14.07. <br />ARTICLE 7 - INDEMNIFICATION <br />7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, and others in accordance with <br />paragraph 6.20 (Indemnification) of the General Conditions (and Supplementary Conditions <br />if applicable) to the Construction Contract. <br />ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS <br />8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the <br />following representations: <br />A. CONTRACTOR has examined and carefully studied the Contract Documents and the other <br />M related data identified in the Bidding Documents., <br />B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the <br />general, local, and Site conditions that may affect cost, progress, and performance of the <br />Work. <br />C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and <br />Regulations that may affect cost, progress, and performance of the Work. <br />D. CONTRACTOR has carefully studied all: (1) reports of explorations and tests of subsurface <br />conditions at or contiguous to the Site and all drawings of physical conditions in or relating to <br />existing surface or subsurface structures at or contiguous to the Site (except Underground <br />Facilities) which have been identified in the Supplementary Conditions as provided in <br />paragraph 4.02 of the General Conditions and (2) reports and drawings of a Hazardous <br />Environmental Condition, if any, at the Site which have been identified in the Supplementary <br />Conditions as provided in paragraph 4.06 of the General Conditions. <br />E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having <br />done so) all additional or supplementary examinations, investigations, explorations, tests, <br />studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at <br />or contiguous to the Site which may affect cost, progress, or performance of the Work or <br />L� which relate to any aspect of the means, methods, techniques, sequences, and procedures <br />�I of construction to be employed by CONTRACTOR, including applying the specific means, <br />r� methods, techniques, sequences, and procedures of construction, if any, expressly required <br />LJ <br />r. Last Revision 12/2008 00520-4 Egret Marsh <br />L.�I <br />
The URL can be used to link to this page
Your browser does not support the video tag.