Laserfiche WebLink
aby the Contract Documents to be employed by CONTRACTOR and safety precautions and <br />programs incident thereto. <br />F. CONTRACTOR does not consider that any further examinations, investigations, <br />explorations, tests, studies, or data are necessary for the performance of the Work at the <br />n Contract Price, within the Contract Times, and in accordance with the other terms and <br />conditions of the Contract Documents. <br />G. CONTRACTOR is aware of the general nature of work to be performed by OWNER and <br />others at the Site that relates to the Work as indicated in the Contract Documents. <br />H. CONTRACTOR has correlated the information known to CONTRACTOR, information and <br />observations obtained from visits to the Site, reports and drawings identified in the Contract <br />Documents, and all additional examinations, investigations, explorations, tests, studies, and <br />data with the Contract Documents. <br />I. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities, or <br />discrepancies that CONTRACTOR has discovered in the Contract Documents, and the <br />written resolution thereof by ENGINEER's CONSULTANT is acceptable to CONTRACTOR. <br />J. The Contract Documents are generally sufficient to indicate and convey understanding of all <br />terms and conditions for performance and furnishing of the Work. <br />K. CONTRACTOR is aware of the specific limitations of the INSTRUCTIONS TO BIDDERS <br />Section 00200 Article 26 PUBLIC ENTITY CRIMES. <br />ARTICLE 9 - CONTRACT DOCUMENTS <br />9.01 <br />Contents <br />A. The <br />Contract Documents consist of the following: <br />1. <br />This Agreement (pages 00520-1 to 00520-9, inclusive); <br />a <br />2. <br />Section 00610 - Performance Bond (pages 00610-1 to 00610-5, inclusive); <br />3. <br />Section 00612 - Payment Bond (pages 00612-1 to 00612-5, inclusive); <br />4. <br />Section 00700 - General Conditions (pages 00700-1 to 00700-45, inclusive); <br />5. <br />Section 00800 - Supplementary Conditions (pages 00800-1 to 00800-18, inclusive); <br />6. <br />Specifications as listed in the Table of Contents of the Project Manual; <br />7. <br />Drawings consisting of following sheets, with each sheet bearing the following general title: <br />"Egret Marsh Stormwater Park"; <br />C1 through C20; S1C through S6C; C -1A through C -12A; S1A through S11A; E-01 <br />through E-15; and 8 Survey and Topographic Drawings <br />8. <br />Addenda (numbers 1 to 5, inclusive); <br />9. <br />Exhibits to this Agreement (enumerated as follows): <br />a. Section 00550 - Notice to Proceed (page 00500-1); <br />b. Section 00310 — Bid Form (CONTRACTOR's Bid) (pages 00310-1 to 00310-9, <br />inclusive); <br />O <br />c. Section 00452 - Sworn Statement Under Section 105.08, Indian River County Code, on <br />Disclosure of Relationships (pages 00452-1 to 00452-2, inclusive); <br />d. Section 00454 - Sworn Statement Under the Florida Trench Safety Act (pages 00454-1 <br />to 00454-2, inclusive); <br />e. Section 00456 — Qualifications Questionnaire (page 00456-1 to 00456-3, inclusive <br />including 2 attached pages, Item 19 and Signature Page.); <br />�l <br />l <br />0 <br />Last Revision 12/2008 00520-5 Egret Marsh <br />