My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-180
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-180
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 3:52:19 PM
Creation date
10/5/2015 8:52:57 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/03/2008
Control Number
2008-180
Agenda Item Number
15.B.5
Entity Name
Geosyntec Consultants
Subject
Work Order No.16 Class 1 Landfill Vertical Expansion
Area
IRC Landfill facility
Supplemental fields
SmeadsoftID
7433
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta, P.E. <br />26 February 2008 <br />Page 10 of 11 <br />SCHEDULE <br />Geosyntec has prepared a schedule for the Project, which is included as Attachment 2. The <br />schedule, as presented, assumes a start date of 5 May 2008 and projects a Permit Modification <br />Application submittal to FDEP on 2 June 2008. Geosyntec has assumed that the required permit <br />will be obtained within three months of submission. Response to FDEP comments will be <br />performed during this three-month period. Therefore, it is anticipated that the permit for the <br />vertical expansion will be issued by 4 August 2008. <br />Geosyntec will proceed with Phase 3: Construction Procurement Services during the permit <br />review period and anticipates completion of the Construction Documents for procurement with <br />WMIF by 4 August 2008, with contract negotiation and award by 18 August 2008. <br />The placement of C&D debris on the slopes of Segment 1 by WMIF will continue without <br />interruption and will be completed by 1 September 2008. During this period, Geosyntec will <br />periodically monitor progress to ensure that the work progresses on schedule and in accordance <br />with the design grades. The on-site borrow pit preparation activities will commence on 4 August <br />2008, and is expected to be completed within 30 days. Thereafter, the borrow pit will commence <br />operation to supply material for the various construction components. <br />Construction of the vertical expansion and GCCS should start by September 2008 and be <br />completed by August 2009. For budgeting purposes, however, Geosyntec has assumed a six- <br />month construction period for on-site monitoring and testing activities. Construction <br />certification report and approval by FDEP should be completed by 30 September 2009. <br />Geosyntec recognizes the importance of the schedule for SWDD and their need to obtain the <br />required disposal capacity from the Class I landfill vertical expansion. Throughout the duration <br />of the Project, Geosyntec will work diligently to meet those milestones and the schedule <br />developed for the Project. <br />XL07232/JL80057IRC PROPOSAL.doc <br />e gii2t'crs i scientists 1 innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.