My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-180
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-180
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 3:52:19 PM
Creation date
10/5/2015 8:52:57 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/03/2008
Control Number
2008-180
Agenda Item Number
15.B.5
Entity Name
Geosyntec Consultants
Subject
Work Order No.16 Class 1 Landfill Vertical Expansion
Area
IRC Landfill facility
Supplemental fields
SmeadsoftID
7433
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta, P.E. <br />26 February 2008 <br />Page 9 of 11 <br />the contract documents. Resident engineering support services are expected to include <br />engineers, administrative assistants, CADD operators, and word processors, as needed. <br />As part of the Resident Engineering Phase, Geosyntec will prepare a final CQA certification <br />report, which will include as -built record drawings, including geomembrane panel layout <br />drawings, for the Project. The report will contain a narrative describing, in detail, the aspects of <br />field activities associated with the Class I landfill vertical expansion and GCCS construction, <br />specifically with reference to the activities identified in this proposal. The report will also <br />include a summary of all conformance and performance tests conducted, testing frequencies, and <br />test results showing compliance with the Technical Specifications and the CQA Plan. The <br />documentation of construction activities (presented on daily summary reports, monitoring logs, <br />test data sheets, nonconformance identification and corrective measures reports, and design <br />change records) will be included as appendices to the final report. The as -built record drawings <br />will be prepared for the project, in AutoCAD format, in order to illustrate the details of <br />construction, any approved design changes, and other relevant information. <br />The final CQA certification report and as -built record drawings will be signed and sealed by a <br />registered professional engineer in the State of Florida. Geosyntec will prepare the report within <br />30 days of completing the construction activities. Five copies of the final CQA certification <br />report will be submitted to FDEP for approval on behalf of SWDD. An electronic copy of as - <br />built drawings in AutoCAD format will also be submitted to SWDD. <br />BUDGET ESTIMATE <br />A budget estimate for the scope of work outlined in Phases 1 through 4 of this proposal is <br />summarized in the following table, and a detailed budget estimate is provided as Attachment 1. <br />The budget estimate does not include permit fees that will be required at the time the permit <br />modification application is submitted to FDEP. <br />Phase 1: General Consulting/Meeting Support/Project Management $41,580 <br />Phase 2: Vertical Expansion Design Modification $11,783 <br />Phase 3: Construction Procurement Services $26,017 <br />Phase 4: Construction Support Services $290,997 <br />TOTAL $370,377 <br />Geosyntec will not exceed the cost estimate without prior approval and written authorization <br />from SWDD. <br />XL07232/JL80057_IRC PROPOSAL.doc <br />engineers 1 sciemists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.