My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-180
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-180
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 3:52:19 PM
Creation date
10/5/2015 8:52:57 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta, P.E. <br />26 February 2008 <br />Page 8 of 11 <br />tests in accordance with the test methods described in the Technical Specifications and CQA <br />Plan. The test results will be reviewed by the CQA Site Manager. SWDD will be provided with <br />regular updates of the conformance testing activities and results. Summary reports of the <br />laboratory conformance test results will be presented in the certification report. <br />Geosynthetic CQA Laboratory Services <br />Geosyntec proposes to perform: (i) conformance testing of the geosynthetic materials; and (ii) <br />destructive testing of the geomembrane seams at an off-site geosynthetic CQA testing laboratory. <br />Conformance sampling of the geosynthetics will be undertaken at the manufacturing plant prior <br />to shipment of the geosynthetics to the site. This will expedite the conformance testing and <br />eliminate delays in the field waiting for test results. Geosyntec will be responsible for <br />coordinating collection of conformance test samples with the geosynthetic CQA laboratory and <br />geosynthetic manufacturer. The geosynthetic CQA laboratory will be responsible for all <br />conformance testing. The results will be faxed to the site in order to achieve a prompt response <br />on test results. <br />Task 4.2: Construction Management <br />Under this task, Geosyntec will provide construction management services throughout the <br />duration of construction. Construction management activities will include conducting pre - <br />construction and weekly construction progress meetings with WMIF and its subcontractor(s), <br />preparing a detailed construction schedule using critical path method (CPM) of scheduling for <br />evaluating construction progress, assisting WMIF and SWDD in identifying critical construction <br />phases and material procurement activities, providing assistance to WMIF in formulating plans <br />to regain the project schedule in case of unforeseen delays, evaluating WMIF payment requests <br />and verifying quantities and conformance with the plans and specifications, and providing <br />contract administration to include construction -related correspondence with WMIF and SWDD. <br />Task 4.3: Resident Engineering <br />Under this task, Geosyntec will provide resident engineering support services throughout the <br />duration of construction. Resident engineering support services will include Construction <br />Drawings and Technical Specifications interpretation or clarification, an evaluation of any <br />changed conditions, and engineering analyses for any design changes or improvisations. <br />Geosyntec will also provide support to SWDD in the preparation of modifications, deletions, or <br />additions to the contract documents and correspondence with FDEP on such requests. <br />Contractor change proposals will be evaluated for technical merit, conformance with design <br />intent, and reasonableness with respect to pricing, and likelihood of acceptance by FDEP. <br />Geosyntec will also assist SWDD in the review and approval process for submittals required by <br />XL07232/JL80057_IRC PROPOSAL.doc <br />'?i; ineers scientists i innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.