Laserfiche WebLink
Mr. Himanshu Mehta, P.E. <br />26 February 2008 <br />Page 7of11 <br />quantities for the project and engineering estimate of the probable unit cost for each item. <br />Probable construction costs will be based on such catalogues as R.S. Means, information <br />provided by product manufacturers, and Geosyntec's professional judgment and experience with <br />similar expansion and closure systems and installation projects. <br />Additionally, Geosyntec will prepare a construction schedule based on Geosyntec's <br />understanding of the project and experience with similar landfill construction projects. <br />Phase 4: Construction Support Services <br />Geosyntec will perform the construction -related services and provide engineering support <br />associated with construction of the Project under three main tasks: (i) Field CQA Services; (ii) <br />Construction Management; and (iii) Resident Engineering/Certification Services. <br />Task 4.1: Field CQA Services <br />Under this task, Geosyntec will provide CQA services during construction of the vertical <br />expansion and GCCS and on-site borrow pit operations. Quality assurance monitoring, testing <br />methods, test frequencies, and the reporting requirements will be performed in accordance with <br />the CQA Plan, ASTM Standards, and applicable portions of Chapter 62-701, F.A.C. The work <br />will be executed by an experienced project team consisting of office managerial staff and on-site <br />CQA representatives. <br />Geosyntec will provide on-site monitoring services for the activities associated with construction <br />of the Project. The CQA services will be provided by a CQA Site Manager and Engineering <br />Technicians, as needed. The CQA Site Manager will be responsible for CQA activities <br />throughout the project including monitoring construction, coordinating soils and geosynthetics <br />testing, and maintaining documentation of CQA activities at the site. <br />Geosyntec will assign one CQA field personnel for every major construction activity being <br />performed by the Contractor. For geosynthetics installation, one field CQA personnel can <br />monitor two welding technicians. If at times several liner system installation operations are <br />conducted simultaneously, the on-site CQA personnel will monitor those operations that are <br />considered most critical to the performance of the liner system. Any non -conforming or <br />questionable practices observed by Geosyntec will be brought to the attention of the concerned <br />parties for review and correction. <br />Geotechnical Laboratory Services <br />Geosyntec will provide independent geotechnical QA/QC laboratory testing related to the <br />construction. Experienced laboratory technicians will perform the required soils conformance <br />XL07232/JL80057IRC PROPOSAL.doc <br />engineers 1 scientists 1 innovators <br />