My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-180
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-180
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 3:52:19 PM
Creation date
10/5/2015 8:52:57 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/03/2008
Control Number
2008-180
Agenda Item Number
15.B.5
Entity Name
Geosyntec Consultants
Subject
Work Order No.16 Class 1 Landfill Vertical Expansion
Area
IRC Landfill facility
Supplemental fields
SmeadsoftID
7433
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta, P.E. <br />26 February 2008 <br />Page 6 of 11 <br />Application will be required for this work. Geosyntec will provide four complete copies of the <br />application to FDEP Central District and two copies to SWDD. <br />Task 3: Response to Regulatory Comments <br />Following submittal of the permit modification application, Geosyntec will meet with FDEP to <br />present and discuss the contents of the application. Geosyntec will provide FDEP with written <br />responses to requests for additional information (RAI) throughout the course of the permit <br />review process. For the purpose of the budget estimate, Geosyntec has estimated. response to one <br />RAI will be required. <br />Phase 3: Construction Procurement Services <br />Geosyntec will provide the engineering services required for SWDD to procure the construction <br />of the following: (i) Class I landfill vertical expansion liner system; (ii) expansion and upgrade <br />of the GCCS; and (iii) operation of the on-site borrow pit for supply of fill material. It is <br />understood that SWDD will contract the construction services of the project to WMIF, the <br />current contractor for operation of the Class I landfill, including the on-going placement of C&D <br />debris on Segment 1. As part of this phase, Geosyntec will prepare construction documents and <br />a construction cost estimate as described below. <br />Task 3.1: Construction Documents <br />Geosyntec will prepare a set of construction drawings for each of the three components of the <br />construction project. The construction drawings for the Class I landfill vertical expansion will be <br />extracted from the permit application drawings and will include sufficient details necessary for <br />construction of each component of the project. The construction drawings will include control <br />points along the top of berms, toes of slopes, and other critical locations, including 50 -ft grid <br />intervals, liner system details, and cross sections to facilitate construction and certification of the <br />project. Construction drawings for the GCCS and borrow pit operations will be prepared, as <br />necessary. <br />Technical Specifications and the CQA Plan will be compiled as part of the Construction <br />Documents. The specifications will be prepared using the industry -standard Construction <br />Specification Institute (CSI) format. <br />Task 3.2: Construction Cost Estimate <br />Geosyntec will also prepare an Engineer's Estimate of Probable Construction Cost for the three <br />phases of the project to serve as a basis for comparison of bids from WMIF during the <br />procurement process. Probable construction cost will be based on estimated construction <br />XL07232/JL80057_IRC PROPOSAL.doc <br />engineers 1 scion t i':i 1 innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.