Mr. Himanshu Mehta, P.E. <br />26 February 2008 <br />Page 5 of 11 <br />For the purpose of this budget estimate, Geosyntec has included four meetings: (i) one kickoff <br />meeting with SWDD; (ii) two meetings with FDEP and SWDD staff; and (iii) one meeting with <br />the SWDD Board, if requested by SWDD. Progress meetings during construction of the vertical <br />expansion liner system and GCCS are included in Phase 4. <br />Phase 2: Vertical Expansion Design Modification and Permitting <br />Phase 2 consists of design modification and preparation of permit application to decrease the <br />Segment 1 top deck slopes from 5 percent to 2 percent to accelerate construction of the vertical <br />expansion. For budgeting purposes this phase has been divided in the following three tasks, as <br />presented below. <br />Task 1: Engineering Design <br />Under this task, Geosyntec will perform engineering analysis and design necessary to reduce the <br />slope of the top of Segment 1 in the west -to -east direction from the current 5 percent. Geosyntec <br />will perform the design analyses and calculations required to modify Permit Modification Nos. <br />S031-0128769-011, S031-0128769-012, and S031-0128769-013 for C&D placement on Segment <br />1 slopes as well as the Class I landfill vertical expansion. Geosyntec will perform the following <br />activities as part of the engineering design: <br />• modifying the layout and grading of C&D debris placement on the top and side slope <br />areas of Segment 1; <br />• re-evaluating of stability and settlement of the final cover system; <br />• waste containment design analyses to demonstrate gravity flow of leachate from <br />Segment 1 vertical expansion into the Infill Area leachate collection system; <br />• modification of the design of the surface water drainage system to collect and convey <br />the storm water runoff from the final cover system to the perimeter toe ditch; and <br />• modification of financial assurance calculations, if necessary. <br />Task 2: Vertical Expansion Permit Application <br />Under task, Geosyntec will prepare the Permit Modification Application for the Class I landfill <br />vertical expansion. The permit application will include the engineering reports and drawings in <br />support of the permit modification application in accordance with Chapter 62-701, FAC. For <br />budgeting estimating purposes, Geosyntec has assumed that a Minor Modification Permit <br />XL07232/JL80057IRC PROPOSAL.doc <br />engineers 1 scientists I innovators <br />