My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/20/1981
CBCC
>
Meetings
>
1980's
>
1981
>
5/20/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:17 AM
Creation date
6/11/2015 1:07:26 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/20/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SVERDRUP ?c PARCEL AND AssoCIATES, INC. <br />AND <br />BEINDORF ANbASSOCIATES, INC. t <br />(A JOINT VERJTURE) <br />Project No. <br />April 29, 1981 <br />MEMORANDUM <br />TO: George Liner, Utilities Dept. <br />Indian River County <br />FROM: John A. Robbins <br />SUBJECT: Status Report of Projects by Sverdrup & Parcel and Associates, Inc. <br />and Beindorf and Associates, Inc. (A Joint Venture) <br />ITEM L1 - SOUTH COUNTY TAX DISTRICT Engineer's Proj. No. 6858 <br />667 <br />Status of the South County 4,later System is as follows: <br />--We have received the report from our hydrogeological consultants, <br />Geraghty, & Miller, -to -be used .as final supporting documentation for_.- <br />our water use perit to be issued by St. Jobns River Water <br />Manage-ment District (SJRW D). - <br />- --We have received -a report by the Cast Iron Pipe Research Association <br />(CIPRA), which defines the areas within_our proposed Phase 1 transmis- <br />sion system Which will require special pipe protection to reduce the <br />possibility of corrosion. Comments outlined in the subject report _ <br />will be incorporated into our final plans and specifications. We are <br />also in the process. of preparing maintenance maps on Oslo Road.for the <br />purpose of establishing specific areas for construction of our pipe - <br />Tine along Oslo Road. These maintenance maps will -be completed within <br />.the very near future. -The trans;lisslon system design has been reviel.;ed <br />by the County's Utilities Cepart;,,ent, and we are currently incorporating <br />these- continents into our final design. We have completed the site plan; <br />review process with the Indian River County Planning Department and have <br />received site plan -approval -for the grater treatment plant site. In ad,di- <br />tion-, we have teen assisting the South Ccunty Fire District Ji i their site <br />plan process, and will -continue to work with them -through the site <br />plan review process. — - <br />--We are currently.completing the final designs, plans and specifica- <br />tions for the treatment fac-ility,=transmission system, elevated and <br />ground storage_.tanks. Weare—currently prgparing permit applica- <br />tions -to the various regulatD ry agencies=for final approval for the <br />proposed systems. ,. <br />--We are currently at a 75% completion status,: of the entire design for <br />the Phase I Water System Improvements for the. -South County Watof, <br />System. Our -current schedule is.as follo-ws:' We anticipate advertise <br />-ing for bid for each of the three contracts for this -project on <br />June 1; 1981. -Furthermore, we anticipate receiving bids -on all three <br />contracts on June 31, 1931. It is our intention to review the bids <br />received at that point and be in.a position to make a recemmendation <br />_ for the award of the contract on August 1, 1981. - <br />
The URL can be used to link to this page
Your browser does not support the video tag.