My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/20/1981
CBCC
>
Meetings
>
1980's
>
1981
>
5/20/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:17 AM
Creation date
6/11/2015 1:07:26 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/20/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY -2o <br />ITEM #2 - GIFFORM AREA SEWERAGE IMPROVEMENTS Engineer's Proj. No. 5675-G <br />Status of the Gifford Area. Sewerage Improvements is as fol1olds: <br />--Construction of the Gifford area system is progressing as 'scheduled.' <br />Currently, the reinforcements to the existing gravity collection system <br />have been completed, and the -force main from the pump station to the <br />sewage -treatment plant has been instaTled and pressure -tested. In addi-- <br />tion, the _force main -from the High Ridge Mobi1e.Home Park has also been <br />laid; a-nd is-anifolded to the 6" line which ultimately discharges at <br />the sewag-e treatment plant. Pond construction is nearing completion, <br />and the- majority of the sewage treatment plant has been installed. <br />- The. Contractor is awaiting shipment or -various equip,;ent items. -We antic- <br />- ipate the project to be completed within the -contract .time period. <br />ITEM #3 - PEBBLE BAY AREA SEI-JERAGE IMPROMIENTS' Engineer's Proj.-No. 6765 <br />Status of Pebble Bay Area Sewerage Improvements is as follows: <br />--We are currently in the process of completing -plans and specifications <br />for the wastewater system which will connect the Town of Indian River - <br />Shores and the County's. encl-ave are -a Lo the City of Vero Beach's system. <br />lde have,receivedaerial photographs whi-eh were-flo;•rn specifically for <br />this project and are currently placing.final design information on the <br />referenced aerial photographs: <br />--We will be working with the County Utilities Department in an effort <br />to coordinate the exact bidding requirements of the work for the <br />County in conjunction with the bidding arr-angements for the Torn of <br />Indian River Shores. These two projects are interrelated. It will <br />be necessary to bid the projects concurrently so -that construction <br />activities may .be coordinated and the entire system be constructed <br />_ within the same tire frame. <br />ITEM ll4 20-1 FACILITIES PLAN Engineer's Proj. No. 6383-C <br />Status of the 201 Facilities Plan is as follows: <br />--We have met with theTorn of Orchid to discuss the resolution adopt- - <br />ing the 201 Plan. '-•,e .rill be foniarding information to the Town of <br />Orchid which they have indicated is necessary in order for them to <br />prepare and adopt a resolution. <br />--We will be submitting an Addendum No. 2 to the 201 Plan which will <br />correct typographical errors that were contained in the original <br />report. These errcrs :,,ere brought to ou.r attention by the Department <br />of Environmental Regulation (DER). Furthermore, the Addendum .fill <br />contain the various r=esolutions adopted by the participating munici- <br />palities approving the 201 Plan, as well as certain wastewater agree- <br />ments required •uy the DER nor inclusion in tine 201 -Plan. It is our <br />intention to present the Ac:;endum to the Board of County Commissioners <br />as quickly as it can to sc!;eduled at their next regular meeting. <br />ITEM r5 - THE LEGAL AGREEiiE;IT R"IE1J FOR - <br />UTILITIES DEPARTI•ENT <br />Engineer's Proj. No. 6383-« <br />-Status of the Lecal Acreem--nt Revie,,i for the Utilities Department <br />is as follows: V - <br />--We are currently worO ig wilth the Utilities Department in the revi2•.•r <br />of the final draft for the between bet:•reen Indican River County and <br />Vista Properties to aac,;ui•re the Vista uti 1 i t i es system. 4!e Sv'i 11 <br />continue wor; i ng 4•ri th tl-e�'Uti 1 i ties Department and County Attorney <br />on this matter. <br />38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.