Laserfiche WebLink
LENGTHY DISCUSSION FOLLOWED AND REFERENCE WAS MADE TO THE <br />ESTIMATED WATER BILL GRAPHS. <br />MR. ROBBINS STATED THAT IN ORDER FOR THE COUNTY TO SERVE <br />THE SOUTH BEACH, THE SUBAQUEOUS CROSSING HAS TO OCCUR - THE NON -VESTED <br />PEOPLE ARE GOING TO BE GENERATING IMPACT FEES FOR EXTENDING THAT <br />LINE. HE REPORTED THAT THE RATE STRUCTURE FOR SOUTH BEACH WOULD BE <br />THE UNIFIED COUNTY RATE STRUCTURE; THE COUNTY COULD ASSESS AN IMPACT <br />FEE FOR THOSE PEOPLE WHO ARE NOT VESTED. <br />LENGTHY CONVERSATION ENSUED REGARDING THE IMPACT FEES. <br />IT WAS POINTED OUT THAT THE COUNTY MUST GENERATE SOME FORM OF REVENUE <br />FOR PHASE 2 IMPROVEMENTS. <br />MR. ROBBINS THEN REFERRED TO PAGE 3 OF THE REPORT REGARDING <br />THE IMPACT FEES IF THE CITY AND/OR COUNTY WERE TO PROVIDE SERVICE. <br />HE COMMENTED THAT THEY HAVE PERFORMED AT LEAST TWELVE COMPUTER <br />SIMULATIONS OF THE VARIOUS PERMUTATIONS FOR PROVIDING WATER SERVICE <br />TO THE SOUTH BEACH AREA. HE REPORTED THAT THEY HAVE ANALYZED MANY <br />CONDITIONS WITH -FIRE FLOW, AVERAGE DAY FLOW, -AND MAXIMUM DAY FLOW <br />ABOUT 12 TIMES IN ORDER TO MAKE SURE THAT THIS LARGE WITHDRAWAL <br />WOULD NOT HAVE ANY NEGATIVE IMPACT AND WILL NOT CREATE ANY DETRIMENTAL <br />EFFECT TO THE PRESSURE DISTRIBUTION, THE AVAILABILITY OF FIRE FLOW, <br />OR THE AVAILABILITY OF POTABLE WATER FOR -HUMAN CONSUMPTION. <br />HENRY HULLER, A POTENTIAL CUSTOMER, CAME -BEFORE THE <br />BOARD AND ANNOUNCED THAT THIS WAS THE BEST. -PRESENTATION HE HAS HEARD <br />ON THIS SUBJECT. HE THEN DISCUSSED HIS DEVELOPMENT, OCEAN RIDGE <br />SUBD-IVISION, WHICH HAS NO WATER, AND WAS CURIOUS -WHEN THE COUNTY'S <br />SERVICE WOULD-BE AVAILABLE.- <br />MR. <br />VAILABLE.MR. ROBBINS ADVISED THAT PERMITTING WOULD TAKE3 TO 6 MONTHS; <br />ENGINEERING PLANS WOULD TAKE 4 -TO 6.MONTHS TO -COMPLETE; AND 75% THROUGH <br />THE ACTUAL DESIGN, THE INITIAL PERMITS WOULD BE SENT OUT FOR REVIEW <br />AND THEN THE FINAL DESIGN WOULD BE SUBM-I TTED ^1`0 THE- REGULATORY <br />AGENCIES. -MR. ROBBI.NS FELT -IT WOULD TAKE 12 -MONTHS OF CONSTRUCTION <br />TIME, AND HIS CONSERVATIVE ESTIMATE WOULD BE 19 MONTHS IN ALL. <br />MRS NIULLER FELT 24 MONTHS MIGHT BE -MORE APPROPRIATE TO <br />ALLOW FOR THE USUAL DELAYSI HE COMMENTED -THAT IN THE -TWO YEAR <br />41 eoo� 46- RAGE 488 <br />MAY 2 0:1981 - <br />