My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/20/1981
CBCC
>
Meetings
>
1980's
>
1981
>
5/20/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:17 AM
Creation date
6/11/2015 1:07:26 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/20/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY 20198.146 *,E489 - <br />PERIOD THE RATE -OF CONSTRUCTION MIGHT NOT BE REACHED,- AND HE -MIGHT <br />BE ABLE TO WORK OUT A RENTAL AGREEMENT WITH -THE MOORINGS OR THE _ <br />COUNTY. HE S-TATED HE -WAS LOOKING TO SIGN A USERS AGREEMENT AND WAS <br />JUST GETTING BY UNTIL THE COUNTY -HAD THE FACILITY COMPLETED. <br />-DAVID GREGG, CITY COUNCILMAN, COMMENTED THAT THE CITY WAS <br />SYMPATHETIC TOWARD THIS PROBLEM. HE STATED -THAT IF THE CITY HAS <br />THE CAPACITY, AND IT WAS THE -COUNTY I S DESIRE TO RELEASE THE SOUTH - <br />BEACH WATER SERVICE TO THEM, THEY WOULD BE -HAPPY TO LOOK IN -THAT_ _ <br />DIRECTION. <br />DISCUSSION ENSUED ON THIS MATTER. <br />COMMISSIONER WODTKE NOTED THAT THIS SERVICE IN PHASE I <br />IS RESTRICTED TO ONLY 1,000 CUSTOMERS-. HE ASKED IF THE STORAGE TANK <br />WOULD PROVIDE ADDITIONAL CUSTOMERS, WOULD THE ENGINEERS CONSIDER <br />INCLUDING THE GROUND STORAGE TANK I -N PHASE I. <br />MR. ROBBINS FELT IT COULD BE EASILY DONE IN PHASE I BY <br />MODIFYING CONSTRUCTION COST LINE ITEMS. BY PUTTING IN THE GROUND <br />STORAGE TANK AND BOOSTER PUMPING STATIONS, MR. ROBBINS FELT ALL THE <br />AREA COULD BE SERVICED IN PHASE I. <br />COMMISSIDN.ER BIRD WONDERED IF THERE WAS ANY FEASIBILITY IN <br />GOING AHEAD WITH PHASE 2 IF THERE WERE REASONABLE IMPACT FEES THAT <br />COULD BE COLLECTED. <br />MR. ROBBINS COMMENTED THAT IT WAS POSSIBLE AS THE PHASE 2 <br />COST WAS $$00,000. HE FELT IT WOULD BE AN EXCELLENT IDEA,AND THE <br />COUNTY WOULD HAVE THE ABILITY TO COLLECT AND IMMEDIATELY UTILIZE THE <br />IMPACT FEES FOR THE CONSTRUCTION COST IN ORDER TO PAY FOR PHASE 2. <br />MOTION WAS MADE BY COMMISSIONER WODTKE, SECONDED BY COM- <br />MISSIONER BIRD, FOR THE BOARD TO TENTATIVELY APPROVE THAT THEY ARE <br />GOING TO PROVIDE THE SOUTH BEACH WITH WATER, AND TO AUTHORIZE COM- <br />MISSIONER SCURLOCK, ATTORNEY COLLINS, AND .JOHN ROBBINS TO NEGOTIATE <br />WITH THE CITY OF VERO BEACH IMMEDIATELY, AND THAT THE IMPACT FEE <br />APPROACH BE CONSIDERED IN THOSE NEGOTIATIONS. <br />42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.