My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/20/1981
CBCC
>
Meetings
>
1980's
>
1981
>
5/20/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:17 AM
Creation date
6/11/2015 1:07:26 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/20/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F, <br />ANN 11191111000,101* <br />A UNITED STATES DEPARTMENT OF AGRICULTURE F RM APPROVED OMS No. 40-83007 <br />Form FmHA 424-7 FARMERS HOME ADMINISTRATION ORDER No. <br />( Rev. 6-11-80) 1 2 <br />CONTRACT CHANGE ORDER I DATE <br />May 13, 1981 <br />Phase II - Gifford Area Sewage Improvements <br />STAT E <br />Florida <br />coNTIACT ndianRRiver County I COUNTYIndianRiver County <br />OWNER <br />Driveways, Inc. <br />To......................................................................................................................................... <br />(Contractor) <br />You are hereby requested to comply with the following changes from the contract plans and specifications: <br />Description of Changes DECREASE INCREASE <br />(Supplemental Plans and Specifications Attached) in Contract Price in Contract Price <br />SEE ATTACHED SHEET FOR DESCRIPTION OF <br />CHANGES <br />............................................................................ <br />_......_ _ <br />TOTALSS ...................................... .-- .... -.............. <br />_...._�..._:: <br />NET CHANGE IN CONTRACT PRICE S ..._.................... 3,413.40 <br />--JUSTIFICATION- <br />As -built information did not reflect existing elevations and conditions <br />found in the field during construction. Pipe inverts are lower than anticipated <br />requiring the lowering of the wet well bottom elevation in order to use the exist- <br />ing wet well. <br />The amount of the Contract will beXIOMW 0ricreased) By The Sum Of: Three thousand four hundred <br />thirteen and 40/100--=--------------------------=---- 3 413 40 <br />Dollars (S ' ) <br />The Contract Total Including this an&previous Change Orders Will Be: Three hundred seventy-two thousand <br />one hundred forty-nine and 50/100---------------------372,149-50. <br />_ Dollars ($), <br />The Contract Period Provided for Completion Will BeY(Yr>) XAXMXIMiMM Unchanged): -0- Days <br />This docume I ecome a supple to: a contract and all provisions will apply hereto. <br />Requested i - 7 <br />(Owner) _ L115 <br />ate) <br />Recommended -ems ,*✓ L-' <br />(owner's Architee Engineer) _- (Dere) <br />Accepted=�t -. 1 �, ./L�-f - [ 3 ' i - <br />(Contractor) (Date) <br />Approved By FmHA <br />(Name and Title) (Date) <br />This information w111 be used as record of any " Number copies required: 4 No further monies or other benefits may be paid out under this <br />change% to the original construction contract. Time to complete: 30 min. program unless this report Is completed and filed as required by <br />existing law and regulations (7 C.F.R, Part 1924). <br />A U.S.GPO:19804-666.1161ts14 <br />r0,tlin" <br />FIT: HA 424-7 (Rev. 6.11-80) <br />r <br />MAY 20198� 4546. PAG492 <br />-_- _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.