My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/20/1981
CBCC
>
Meetings
>
1980's
>
1981
>
5/20/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:17 AM
Creation date
6/11/2015 1:07:26 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/20/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY 2 01981 <br />4 -PAGE 491 <br />HEPBURN-WALKER, INTERESTED CITIZEN, COMMENTED THAT HE <br />SUPPORTED MR. ROBBINS' METHODS. <br />THE CHAIRMAN CALLED FOR THE QUEST -ION.: IT WAS VOTED ON <br />AND CARRIED 4 TO 1; WITH COMMISSIONER FLETCHER VOTINRG IN OPPOSITION. <br />CHANGE -ORDER #2.- PHASE II GIFFORD AREA SEWAGE IMPROVEMENTS - <br />THE BOARD.NEXT REVIEWED THE FOLLOWING MEMORANDUM: <br />TO: Board of county Cc=- ' ssioners DATE: May 14, 1981 FILE: <br />SUBJECT: Change order No. 2 - Phase II <br />Gifford Area Sewage Improvements <br />FROM: Neil A. Nelson REFERENCES: <br />County Aaninistrator <br />Descriptions and Conditions <br />In the field we learned that the lift station wet -well was deeper <br />than -was originally anticipated. As -built information did not reflect <br />existing elevations and conditions found in the field during construction. <br />Change Order 2 is required to utilize the existing wet well as <br />originally intended in our construction drawings. <br />Alternatives and Analysis" <br />The lift station must be set the depth of the deepest manhole. There <br />is no alternative. <br />Recommendation and Funding <br />The cost of correcting this problem will be $3,413.40. I recommend <br />approving this in order not to further delay this project. <br />ON MOTION BY COMMISSIONER WODTKE, SECONDED BY COMMISSIONER <br />SCURLOCK, THE BOARD UNANIMOUSLY APPROVED CHANGE ORDER #2 FOR PHASE II. <br />GIFFORD AREA SEWAGE IMPROVEMENTS IN THE AMOUNT OF $3,413.40. <br />44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.