My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-431
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-431
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2017 11:30:22 AM
Creation date
10/5/2015 9:03:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/23/2008
Control Number
2008-431
Agenda Item Number
8.G.
Entity Name
Pelican Pete Construction Company
Subject
Oslo Road Boat Ramp Repairs
Area
Oslo Road
Project Number
0381
Bid Number
2009024
Supplemental fields
SmeadsoftID
8748
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. <br />C. <br />Record/As-Built survey shall be performed and subsequent plans prepared by a <br />registered Professional Surveyor and Mapper in the state of Florida and certified <br />per standards as set forth within Florida Statutes, Administrative code and <br />Minimum Technical Standards for that type of survey. All said surveying mentioned <br />above shall be performed under the direct supervision of a registered Professional <br />Surveyor and Mapper in the state of Florida accordingly. <br />The following items are required to be shown on County project Record/As-Built <br />drawings submitted to ENGINEER: <br />As per Chapter 472, Florida Statutes and Chapter 61G17-6.007 Florida <br />Administrative Code As -Built — Record — Specific Purpose Surveys: <br />A Professional Surveyor and Mapper licensed in the state of Florida shall provide <br />an adequate Record/As-Built survey as it relates to the regulations and standards <br />established for said surveys. <br />AND <br />Field measurements of vertical or horizontal dimensions of constructed <br />improvements shall be obtained so that the constructed facility can be delineated <br />in such a way that the location of the construction may be compared with the <br />construction plans. Clearly shows by symbols, notations, or delineations, those <br />constructed improvements located by the survey. <br />1. Right-of-way Swale/Drainage—All culvert inverts elevations and station offsets; <br />inlet grate and bottom elevations; swale beginning and end bottom elevations; <br />and highs and lows along top of bank. Size of swale. <br />2. Pipe Culvert/PVC Sleeves — All inverts, stations and offsets. <br />3. Outfalls — All pipe inverts elevations and station offsets, weir box elevations, <br />weir elevation, and sizes. <br />4. Roadway/Off Site Drainage — All inverts elevations and station offsets; <br />manhole top elevation; grate top elevations. <br />5. Retention Ponds — Perimeter elevations, grade breaks, depths, and calculate <br />pond area at control elevation and grade breaks above water surface. <br />01720-2 01720 Record Documents <br />
The URL can be used to link to this page
Your browser does not support the video tag.