Laserfiche WebLink
construction activity in that portion of the site has temporarily or permanently <br />ceased. <br />D. Inspect each pollution control system at least once per day. Clean and <br />maintain each pollution control system as required by its manufacturer or the <br />OWNER, until the system is no longer needed. If a water quality violation <br />occurs, immediately cease all work contributing to the water quality violation <br />and correct the problem. <br />E. Discharge shall not violate State or local water quality standards in the <br />receiving waters, nor cause injury to the public health or to public or private <br />property, nor to the Work completed or in progress. The receiving point for <br />water from construction operations shall be approved by the applicable <br />regulatory agency and the ENGINEER. <br />F. Promptly repair all damage at n.o cost to the OWNER. <br />1.4 SUBMITTALS <br />A. Shop Drawings: Submit shop drawings of the proposed pollution control and <br />treatment systems in accordance with Section 01340 Supplementary <br />Conditions to the General Conditions. <br />B. Stormwater Pollution Prevention Plan. <br />1.5 STATE CERTIFIED EROSION CONTROL SPECIALTY SUBCONTRACTOR IS <br />REQUIRED FOR DESIGN, INSTALLATION, AND MAINTENANCE <br />A. Site-specific design of the erosion and stormwater pollution control system, <br />and installation and maintenance of all erosion and stormwater pollution <br />control devices, shall be by a State certified erosion control specialty <br />subcontractor who specializes in the design, installation, and maintenance <br />of such devices. After installation, this subcontractor shall maintain the <br />erosion and stormwater pollution control devices until the devices are no <br />longer necessary. (Note: The CONTRACTOR may install and maintain the <br />erosion and stormwater pollution control system under the direction of the <br />State certified erosion control specialty subcontractor.) Before beginning <br />construction, submit to the ENGINEER for review, a Stormwater Pollution <br />Prevention Plan, prepared by the State certified erosion control <br />subcontractor. Construction shall not begin until the Stormwater Pollution <br />Prevention Plan has been submitted to the ENGINEER. The <br />CONTRACTOR shall complete the certification provided at the end of this <br />Section and it shall be a part of the Stormwater Pollution Prevention Plan. <br />F:\Engineering\Capital Projects\0381 Oslo Road Boat Ramp\0381 Contract Documents and Specifications\Technical Specifications - <br />Revised 10-02-08.doc <br />