My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-431
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-431
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2017 11:30:22 AM
Creation date
10/5/2015 9:03:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/23/2008
Control Number
2008-431
Agenda Item Number
8.G.
Entity Name
Pelican Pete Construction Company
Subject
Oslo Road Boat Ramp Repairs
Area
Oslo Road
Project Number
0381
Bid Number
2009024
Supplemental fields
SmeadsoftID
8748
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
construction activity in that portion of the site has temporarily or permanently <br />ceased. <br />D. Inspect each pollution control system at least once per day. Clean and <br />maintain each pollution control system as required by its manufacturer or the <br />OWNER, until the system is no longer needed. If a water quality violation <br />occurs, immediately cease all work contributing to the water quality violation <br />and correct the problem. <br />E. Discharge shall not violate State or local water quality standards in the <br />receiving waters, nor cause injury to the public health or to public or private <br />property, nor to the Work completed or in progress. The receiving point for <br />water from construction operations shall be approved by the applicable <br />regulatory agency and the ENGINEER. <br />F. Promptly repair all damage at n.o cost to the OWNER. <br />1.4 SUBMITTALS <br />A. Shop Drawings: Submit shop drawings of the proposed pollution control and <br />treatment systems in accordance with Section 01340 Supplementary <br />Conditions to the General Conditions. <br />B. Stormwater Pollution Prevention Plan. <br />1.5 STATE CERTIFIED EROSION CONTROL SPECIALTY SUBCONTRACTOR IS <br />REQUIRED FOR DESIGN, INSTALLATION, AND MAINTENANCE <br />A. Site-specific design of the erosion and stormwater pollution control system, <br />and installation and maintenance of all erosion and stormwater pollution <br />control devices, shall be by a State certified erosion control specialty <br />subcontractor who specializes in the design, installation, and maintenance <br />of such devices. After installation, this subcontractor shall maintain the <br />erosion and stormwater pollution control devices until the devices are no <br />longer necessary. (Note: The CONTRACTOR may install and maintain the <br />erosion and stormwater pollution control system under the direction of the <br />State certified erosion control specialty subcontractor.) Before beginning <br />construction, submit to the ENGINEER for review, a Stormwater Pollution <br />Prevention Plan, prepared by the State certified erosion control <br />subcontractor. Construction shall not begin until the Stormwater Pollution <br />Prevention Plan has been submitted to the ENGINEER. The <br />CONTRACTOR shall complete the certification provided at the end of this <br />Section and it shall be a part of the Stormwater Pollution Prevention Plan. <br />F:\Engineering\Capital Projects\0381 Oslo Road Boat Ramp\0381 Contract Documents and Specifications\Technical Specifications - <br />Revised 10-02-08.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.