My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/3/1981
CBCC
>
Meetings
>
1980's
>
1981
>
6/3/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:17 AM
Creation date
6/11/2015 1:09:29 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/03/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUN 31991 Aook 46 u"F 652 <br />CHANGE <br />OWNER <br />p <br />234,617.26 <br />ARCHITECT <br />❑ <br />ORDER <br />CONTRACTOR <br />p <br />2,.986,002.02 , <br />FIELD <br />❑ <br />AIA DOCUMENT G701 <br />OTHER <br />OWNER <br />2.145 14th <br />PROJECT: Indian River County - <br />(name, address) Administration Building <br />TO (Contractor) <br />Reinhold Construction Inc. <br />' P.O.Box 666 <br />Cocoa, FL 32922 <br />CHANGE ORDER NUMBER: 35 <br />7 ARCHITECT'S PROJECT NO:9363 <br />CONTRACT FORAdd i t ions and Renovations - <br />L I CONTRACT DATE:4-2-80 <br />You are directed to make the following changes in this Contract: <br />CP -67 Provide two 400 amp,3-pole fusible switch units in existing <br />main distribution switchboard spaces 02-3 & D4 -2 -at the - <br />owners request to correct unforeseen conditions. <br />The proposed changes in the work may result in additional time <br />required beyond the contract completion date. Additional time <br />wilt be added to the contract that is directly reiated to this change <br />order.- The contractor` will be paid for the addiilonal squired days <br />at the rate of $300.00 (three hundred) per day for fixed overhead <br />costs. The number of days requested are not reflected in the attached <br />documents. <br />The original Contract Sum was . . . . . . . . . . . . . . . . . . <br />Net change by previous Change Orders . . . . . . . . . . . . . . . . <br />The Contract Sum prior to this Change Order was . . . . . . <br />The Contract Sum will be (increased) Yde*MW 4&kUXgYM'by this Change Order. <br />The new Contract Sum including this Change Order will be . . . . . . . <br />The Contract Time will be (increased) (decreased) (unchanged) by <br />The Date of Completion as of the date of this Change Order therefore is <br />CONNELL METCALF & EDDY REiNHOLD CONSTRUCTION INC. <br />ARCHITECT CONTRACTOR <br />_T ?n in [)ixtp Ntg�V P Ilex '5 <br />Address Address <br />Coral sa�at� siFL 33134 Cocoa, FL 32922 <br />$3,384.76 <br />. S <br />2,748,000.00 , <br />. S <br />234,617.26 <br />S <br />2,982,617.26 , <br />S <br />3,384.76 <br />. S <br />2,.986,002.02 , <br />( - - ) Days. <br />INDIAN <br />RIVER COUNTY <br />OWNER <br />2.145 14th <br />Ave <br />Address <br />, <br />Vero Beach, FL 32960 <br />BY BY <br />DATE <br />DATE <br />AIA DOCUMENT 0791 • CHANCE ORDER ..d 19'70 EDITION • AIAO • ® 1470 • THE ONE FACE <br />AMfRICAN INSTITUTE OF ARCHITECTS,-_: YORK AVE., NW, WASHINGTON, D.C. 20006 c'�+' <br />
The URL can be used to link to this page
Your browser does not support the video tag.