i <br />CHANGE OWNER p <br />ARCHITECT D <br />ORDER CONTRACTOR <br />FIELD ❑ <br />AIA DOCUMENT G701 OTHER <br />PROJECT: Indian River County CHANGE ORDER NUMBER: 33 <br />(name.address) Administration Building - <br />TO (Contractor) <br />- <br />-� r ARCHITECT'S PROJECT No:9363 <br />Reinhold Construction Inc. CONTRACT FORAdditions <br />and Renovations <br />P.O. Box 666 <br />Cocoa, FL 32922 <br />L CONTRACT DATE: 4-2-8o <br />You are directed to make the following, changes in this Contract: <br />CP -71 <br />Provide moistureproof gypsum board ceilings in toilet <br />$643,44 <br />rooms S112 & S113 <br />CP -78 <br />In room N112 rempve freezer insulation and laminate <br />$667.13 <br />wall with drywall in its place. <br />CP -80 <br />There is moisture damage to walls in room N113. Correct <br />$647.76 <br />damage and laminate damaged area with gypsum wall board. <br />CP -85 <br />Laminate north, south and west walls t5at are not finished <br />$409.50 <br />in room N139. <br />' <br />The above at the owners request to correct unforeseen <br />conditions in the field. Tot al-T2,3�7,b3_ <br />The proposed changes in the to-.)rk may result in additional time <br />required beyond the contract completion date. Additional time <br />Hili be added to the contract that is directly related to this change <br />order. The contractor° ori11 be paid for the additional required days <br />at the rate of$300.00.(three hundred) per day for fixed overhead <br />costs. The number of days requested are not reflected in the attached <br />documents. <br />The original Contract Sum was . . . . . . . . . . . . . . . . . . . . . S $2 , 748 , 000.00 <br />Net change by previous Change Orders . . . . . . . . . . . . . . . . . . S 229,236.07 , <br />The Contract Sum prior to this Change Order was . . . . . . . . . . . . . $ 2,977,836.07 <br />The Contract Sum will be (increased) by this Change Order . . . $ 2,367.83 <br />, <br />The new Contract Sum including this Change Order will be . . ... . . . . . $ 2.,980,203.90 <br />The Contract Time will be (increased) (decreased) (unchanged) by ( - - ) Days. <br />The Date of Completion as of the date of this Change Order therefore is <br />CON4ELL METCALF E EDDY <br />ARCHITECT <br />t37n S nixip,H(ghway <br />Address . <br />EM <br />DATE 1/ .S <br />REINHOLD CONSTRUCTION INC. <br />COP n P <br />Address <br />Cocoa, FL 32922 <br />By <br />DATE <br />INDIAN RIVER COUNTY <br />COWy ER <br />2i4S 149 Ave <br />Address , <br />Vero Beach, FL 32960 <br />�9 V� <br />QY <br />DATE J � 2 <br />i <br />AIA DOCUMENT Gni CHANGE ORDER • APRIL 1470 EDITION • AIAS • 0 1070 • THE ANE PAGE <br />AMERICAN INSTITUTE Of ARCHiTECT$,1715 NEW YORK AVE., NW, WASHINGTON, D.C. AM <br />JUN 31981 R10 4 PAGE 657 <br />