Laserfiche WebLink
4uh � i -V81 <br />COWNER D <br />CHANGE <br />ARCHITECT p <br />ORDER CONTRACTOR C� <br />FIELD ❑ <br />AIA DOCUMENT G701 OTHER <br />PROJECT: Indian River County CHANGE ORDER NUMBER: 34 <br />(name.address) Administration Building <br />TO (Contractor) <br />ARCHITECT'S PROJECT NO:9363 <br />r Reinhold Construction Inc. CONTRACT fORAdditions and Renovations <br />P.o.Box 666 <br />Cocoa, FL 32922 <br />L. . I CONTRACT DATE:4-2-80 <br />You are directed to make the following changes in this Contract: <br />CP -61 In room S101 revise telling height to 8'-6" and provide <br />101HVAC diffuser per attached CP -61 & CP -61A <br />CP -64 Eliminate metal frame and glass at rooms Slll & S109 <br />at the owners request. Show credit.own2rs request. <br />CP -65 In lab room S-126 provide new sink and relocate <br />thermostat per attached CP -65 at owners request. <br />CP -68 Provide moisture resistant gypsum wallboard ceilings <br />in toilet rooms S137, 5138, S141 & S142.Requested by <br />owner to correct unforeseen conditions. <br />CP -81 Cut bottom from metal doors 2nd floor meth. room to <br />correct unforseen condition requested by owner. <br />$1,107.74 <br />V-175.00) <br />$925.25 <br />$407.52 <br />$147.85 <br />Total $Z,413-36 <br />The proposed changes in the work may result in additional time <br />required beyond the contract completion date. Additional time <br />will be added to the contract that Is directly related to this change <br />order. The contractof will be paid for the additional required days <br />at the rate of$300.00 (three hundred) per day for fixed overhead <br />costs. The number of days requested are not reflected In the attached <br />documents. <br />s 2,748,000.00 <br />The original Contract Sum was . . . . . . <br />. . <br />S 232,203-90 <br />Net change by previous Change Orders . . . . . . . . . . . . . . <br />$ 2,980,203.90 <br />The Contract Sum prior to this Change Order was . . . . . . . . . . . . . <br />. . <br />2,413.36 <br />The Contract Sum will be (increased) Xd4EydjVdj>DjK&MgM>by this Change order. <br />. . $ <br />The new Contract Sum including this Change Order will be . . . .. . . . . <br />. . S 2,982,617.26 <br />The Contract Time will be (increased) (decreased) (unchanged) by <br />( - - ) Days. <br />The Date of Completion as of the date of this Change Order therefore is <br />CONNELL METCALF & EDDY REINHOLD CONSTRUCTION INC. <br />INDIAN RIVER COUNTY <br />ARCHITECT CONTRACTOR <br />aox 666 <br />Ow�+IER <br />21- 5 14th Ave <br />137n sn ntxio Highway p.,o <br />Address Address <br />Coral ab es. FL 33134 Cocoa FL 32922 <br />Address <br />Vero Beach,} Fill 32960 <br />, <br />BY By <br />DATE S�JL-j DATE �' ` �- ( <br />DATE <br />AIA DOCUMENT G71" • CHANGE ORDER • APRIL 17ffl.Z: (TION AIAe s @ IM • THE <br />ONE FACE <br />AMERICAN INSTITUTE Of ARCHITECTS,173S NEW YORK Alvt. NW, WASH-,- i _.:)N. D.C. ZM <br />