My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-024
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 3:20:58 PM
Creation date
10/5/2015 9:02:53 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/22/2008
Control Number
2008-024
Agenda Item Number
7.I.
Entity Name
Timothy Rose Contracting
Subject
Vero Lake Estates Master Plan Water Main Phase II
Area
Vero Lake Estates
Project Number
UCP 2958
Bid Number
2008020
Supplemental fields
SmeadsoftID
8663
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Contractor shall reimburse the Owner for additional engineering and/or inspection costs incurred <br />as a result of overtime work in excess of the regular working hours stipulated in Article SC -6.02C. At <br />Owner's option, overtime costs may either be deducted from the Contractor's monthly payment <br />request or deducted from the retainage prior to release of final payment. Overtime costs for the <br />Owner's personnel shall be based on the individual's current overtime wage rate. Overtime costs for <br />personnel employed by the Engineer or Owner's independent testing laboratory shall be calculated <br />in accordance with the terms of their respective contracts with the Owner. <br />SC 6.04A.1 Add the following sentence immediately after the existing text in paragraph 6.04 A.1 of <br />the General Conditions: <br />Additionally, any and all changes to the Project's critical path must be reflected in each Project <br />schedule. <br />SC -6.04.A.3 Add the following paragraph immediately after paragraph GC -6.04.A.2 of the General <br />Conditions: <br />Contractor shall give Owner full information in advance as to its plans for performing each part of the <br />Work. If at any time during the progress of Work, Contractor's actual progress is inadequate to <br />meets the requirements of the Contract, Owner may, but is not obligated to, so notify Contractor. In <br />such event, Contractor acknowledges and agrees that Contractor shall implement some or all of the <br />following remedial actions at the sole cost and expense of Contractor: (a) Increase manpower in <br />such quantities and crafts as necessary to eliminate the backlog of Work; (b) Increase the number <br />of working hours per shift, shifts per working day, working days per week, the amount of construction <br />equipment, or any combination of the foregoing to eliminate the backlog of Work; or (c) Reschedule <br />the Work in conformance with the specification requirements. Neither such notice by Owner nor <br />Owner's failure to issue such notice shall relieve Contractor of its <br />obligation to achieve the quality of <br />Work and rate of <br />progress required by the Contract. Failure of Contractor to implement some or all <br />of the remedial actions may be grounds for determination by Owner that Contractor is not <br />prosecuting its Work with such diligence as will assure completion within times specified. Upon such <br />determination, Owner may terminate Contractor's tight to proceed with the performance of the <br />Contract, or any separable part thereof, in accordance with the applicable provisions of this <br />Contract. <br />SC -6.06A <br />Delete Paragraph 6.06A of the General Conditions in its entirety and replace with the following: <br />A. Contractor shall not employ any Subcontractor, Supplier or other, person or organization, <br />(including those who are to furnish the principal items of materials or equipment), whether initially or <br />as a substitute, against whom Owner may have reasonable objection. Acceptance of any <br />Subcontractor, Supplier or other person or organization by Owner shall not constitute a waiver of <br />any right of Owner to reject defective Work. Contractor shall not be required to employ any <br />Subcontractor, Supplier or other person or organization against whom Contractor has reasonable <br />objection. <br />SC -6.068 Delete Paragraph 6.06B of the General Conditions in its entirety. <br />SC -6.08 Delete Paragraph 6.08 of the General Conditions in its entirety and replace with the <br />following: <br />00800-8 <br />H1Projects10741 w3idding Contract Specifications1Spec Template120071008001sepplementary Conditions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.