Laserfiche WebLink
ALL PERMIT, IMPACT, OR INSPECTION FEES APPLICABLE AT THE TIME OF OPENING OF <br />BIDS THAT ARE PAYABLE TO INDIAN RIVER COUNTY IN CONNECTION WITH THE WORK ON <br />THIS COUNTY PROJECT WILL BE PAID BY INDIAN RIVER COUNTY. Contractor acknowledges <br />that the foregoing items are govemed by the provisions of Florida Statutes section 218.80, Public <br />Bid Disclosure Act. Further, Contractor shall pay the applicable business tax and obtain a business <br />tax receipt from the Indian River County Tax Collector. Unless otherwise provided in the Contract <br />Documents, Contractor shall obtain and pay for all applicable construction permits. Owner shall <br />reimburse Contractor for the cost of such permits on the basis of actual cost. Owner shall assist <br />Contractor, when necessary, in obtaining such permits and licenses. As set forth in the Contract <br />Documents, re -inspection fees are payable solely by Contractor. Owner shall pay all charges of <br />utility owners for connections for providing permanent services to the Work. Owner has obtained <br />the Water Permit from Florida Department of Environmental Protection and IRC Right-of-way Permit <br />and such permits are included in the Contract Documents in Section 00901. Owner has <br />obtained/made application for the Florida Department of Transportation right-of-way permit, the <br />NPDES permit, and the dewatering permit, if required. Copies of the foregoing permits are included <br />in the Contract Documents in Section 00901. Any permits issued after issuance of bid documents <br />will be provided as an Addendum. <br />Contractor acknowledges that the foregoing items are govemed by the provisions of Florida Statutes <br />section 218.80 (2006), Public Bid Disdosure Act. <br />SC 6.11 A.3: Delete the words: "arbitration or" in line 9 of paragraph 6.11 A.3 of the General <br />Conditions. <br />SC 6.19A: Delete Paragraph 6.19A. of the General Conditions in its entirety and replace with the <br />following: <br />A. Contractor warrants and guarantees to Owner for one (1) year from the date of Final Completion <br />that all Work will be in accordance with the Contract Documents and will not be defective; provided, <br />however, that manufacturer equipment warranties may be of a longer duration. <br />SC -6.20A <br />Delete paragraph 6.20A of the General Conditions in its entirety. <br />SC -6.21 E <br />Delete paragraph 6.21E of the General Conditions in its entirety and replace with the following: <br />E. Contractor shall not be responsible for the adequacy of the performance criteria or design <br />criteria required by or contained in the Contract Documents. <br />ARTICLE 7 OTHER WORK AT THE SITE <br />00800-9 <br />Ii\Projects107411Bidding Contract Specific ations1Spec Template12007100800tsupplementary Conditions.doc <br />