My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-024
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 3:20:58 PM
Creation date
10/5/2015 9:02:53 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/22/2008
Control Number
2008-024
Agenda Item Number
7.I.
Entity Name
Timothy Rose Contracting
Subject
Vero Lake Estates Master Plan Water Main Phase II
Area
Vero Lake Estates
Project Number
UCP 2958
Bid Number
2008020
Supplemental fields
SmeadsoftID
8663
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 8 OWNER'S RESPONSIBILITIES <br />SC -8.02 Delete paragraph 8.02 of the General Conditions in its entirety and replace with the <br />following <br />If Owner terminates the employment of Engineer, Owner may appoint another engineer whose <br />status under the Contract Documents shall be that of the former Engineer. <br />SC -8.04 Delete paragraph 8.04 of the General Conditions in its entirety and replace with the <br />following: <br />Payments under this contract are govemed by the Local Govemment Prompt Payment Act, Florida <br />Statutes section 218.70 et. seq., <br />SC -8.06 <br />Delete paragraph 8.06 of the General Conditions in its entirety. <br />SC -8.11 <br />Delete paragraph 8.11 of the General Conditions in its entirety. <br />ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION <br />SC 9.02 Delete the first sentence of paragraph 9.03A of the General Conditions in its entirety and <br />replace with the following: <br />A. Engineer will make visits to the Site at intervals appropriate to the various stages of construction <br />as Engineer deems necessary in order to observe as an experienced and qualified Engineer the <br />progress that has been made and the qualityofthe various aspects of Contractor's executed Work. <br />SC -9.03A <br />Add the following new paragraph immediately after paragraph 9.03A of the General Conditions <br />which is to read as follows: <br />B. Engineer will fumish a part-time Resident Project Representative. Contractor is responsible to <br />give 24-hour notice on all required inspections so that the Resident Project Representative may be <br />present. <br />SC 9.04 A Delete the third sentence of paragraph 9.04A of the General Conditions in its entirety and <br />replace with the following: <br />However, if Contractor daims entitlement to additional time or money as a result of the Field Order, <br />such entitlement is conditioned upon obtaining a Change Order authorized and executed by Owner <br />after timely making a Claim as provided in the Contract Documents. <br />SC 9.08-A: <br />Delete the second sentence of 9.08A of the General Conditions in its entirety and replace with the <br />following: <br />00800-10 <br />H\Projects\074118idding Contract Specificationslspec Templat020071008001supplementary Conditions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.