My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-024
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 3:20:58 PM
Creation date
10/5/2015 9:02:53 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/22/2008
Control Number
2008-024
Agenda Item Number
7.I.
Entity Name
Timothy Rose Contracting
Subject
Vero Lake Estates Master Plan Water Main Phase II
Area
Vero Lake Estates
Project Number
UCP 2958
Bid Number
2008020
Supplemental fields
SmeadsoftID
8663
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Except for: (a) Claims for differing subsurface or physical conditionsgovemed <br />and (b) claims for time extensions governed by paragraphand other <br />by paragraph 12.03, all matters in question and other <br />matters between Owner and Contractor arising prior to the date final payment is due, relating to the <br />acceptability of the Work and the interpretation of the requirements of the contract documents <br />pertaining to the performance of the Work, will be referred initially to Engineer in writing within 15 <br />days after occurrence of the event giving rise to such Claim or within 15 days after the claimant first <br />recognizes the condition giving rise to the Claim, whichever is later, provided, however, the Owner <br />shall make all final determination of such matters. <br />SC 9.08-C Delete paragraph 9.08-C of the General Conditions in its entirety <br />SC 9.08-D Delete paragraph 9.08-D of the General Conditions in its entirety <br />SC 10.03 A.3 Delete subparagraph 10.03.A.3 of the General Conditions in its entirety <br />SC 10.05A Delete paragraph 10.05A of the General Conditions in its entirety and replace with the <br />following: <br />A. All Claims shall initially be referred to the Engineer for decision. <br />SC 10.05.8 Delete paragraph 10.05.B of the General Conditions in its entirety and replace with the <br />following: <br />Except for: (a) Claims for differing subsurface or physical conditions govemed by paragraph 4.03; <br />and (b) claims for time extensions govemed by paragraph 12.03, Claims by either party shall be <br />initiated within 15 days after occurrence of the event giving rise to such Claim or within 15 days after <br />the claimant first recognizes the condition giving rise to the Claim, whichever is later, by written <br />notice of the amount or extent of the Claim, dispute, or other matter with supporting data to the <br />Engineer and the other party by written notice stating the general nature of each Claim, dispute, or <br />other matter delivered by the claimant to Engineer and the other party to the Contract A Claim for an <br />adjustment in Contract Price shall be prepared in accordance with the provisions of paragraph <br />12.01.8. A Claim for an adjustment in Contract Time shall be prepared in accordance with the <br />provisions of paragraph 12.02.B. No daim by the Contractor for an equitable adjustment hereunder <br />shall be allowed if asserted after final payment under this Contract. <br />SC 10.05 C Delete paragraph 10.05C of the General Conditions in its entirety. <br />SC 10.05 D and E Delete paragraphs 10.05.0 and E of the General Conditions in their entirety <br />ARTICLE 11 - COST QF THE WORK; ALLOWANCES; UNIT PRICE WORK <br />SC -11.02A Delete paragraph 11.02.A of the General Conditions in its entirety and replace with the <br />following: <br />It is understood that CONTRACTOR has included in the Contract Price all allowances so named in <br />the Contract Documents and shall cause the Work so covered to be performed for such sums as <br />may be acceptable to OWNER. <br />Delete paragraphs 11.028 through D of the General Conditions in their entirety. <br />00800-11 <br />H1Projects107411Bidding Contract Specifications1Spec Template1200710080o1supplernentary Conditions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.