Laserfiche WebLink
14. Completion: <br />a. Before ENGINEER issues a Certificate of Substantial Completion, submit to <br />CONTRACTOR a list of observed items requiring completion or correction. <br />b. Conduct final inspection in the company of ENGINEER, OWNER and <br />CONTRACTOR and prepare a final list of items to be completed or <br />corrected. <br />c. Verify that all items on final list have been completed or corrected and make <br />recommendations to ENGINEER concerning acceptance. <br />C. LIMITATIONS OF AUTHORITY <br />Except upon written instructions of ENGINEER, Resident Project Representative: <br />1. Shall not authorize any deviation from the Contract Documents or approve any <br />substitute materials or equipment. <br />2. Shall not exceed limitations on ENGINEER'S authority as set forth in the Contract <br />Documents. <br />3. Shall not undertake any of the responsibilities of CONTRACTOR; Subcontractors or <br />CONTRACTOR'S superintendent, or expedite the Work. <br />4. Shall not advise on or issue directions relative to any aspect of the means, methods, <br />techniques, sequences or procedures of construction unless such is specifically <br />called for in the Contract Documents. <br />5. Shall not advise on or issue directions as to safety precautions and programs in <br />connection with the Work. <br />6. Shall not authorize OWNER to occupy the Project in whole or in part. <br />7. Shall not participate in specialized field or laboratory tests. <br />END OF SECTION <br />00800-36 <br />H1Projeds107411Bidding Contract Specifications%Spec Template120071008001supplementary Conditions.doc <br />